Employee Cost – CA Inter Costing Study Material
Question 1.
Distinguish between ‘Direct and Indirect labour costs’. [CA In ter Nov. 2001, 2 Marksj
Answer:
Direct Labour Cost is the cost of benefits paid or payable to the employees which can be directly attributed to a cost object in an economically feasible manner. This can be easily identified and allocated to an activity, contract, cost centre, customer, process, product etc.
Indirect Labour Cost is the cost of benefits paid or payable to the employees, which cannot be directly attributable to a particular cost object in an economically feasible manner.
The direct labour cost can be identified with and can be charged to the job. However, indirect labour costs cannot be so charged and is therefore, to be treated as part of the factory OH and it is to be included in the cost of production.
Question 2.
Discuss any four objectives of ‘Time keeping’ in relation to attendance and payroll procedures. [CA Inter Nov. 2020, 4 Marks]
Answer:
The objectives of time-keeping in relation to attendance and paxroll procedures are as follows:
- For the preparation of payrolls.
- For calculating overtime.
- For ascertaining and controlling employee cost.
- For ascertaining idle time.
- For disciplinary purposes.
- For overhead distribution.
Question 3.
Enumerate the various methods of Time booking. [CA Inter May 2007, 2 Marks]
Answer:
Following are the methods of Time Booking:
- Job ticket
- Combined Time and Job ticket.
- Daily time sheet
- Piece work card
- Clock card
Question 4.
Discuss accounting treatment of idle capacity costs in cost accounting. [CA Inter May 2009, May2006, May 2005, May 2003, 3 Marks]
Answer:
Idle time is the time during which no production is carried out because the workers remain idle hut are paid. In other words, it is the difference between the lime paid and the time booked. Idle time can be normal or abnormal.
Treatment of Idle Capacity Cost:
(i) Normal idle time: It is the time which cannot be avoided or reduced in the normal course of business. E.g., Time lost between factory gate and place of work, interval between one job and another, machine setup time, normal rest time, lunch break etc.
Normal idle time cost will be treated as a part of cost of production. In case of direct workers, an allowance for normal idle time is considered setting of standard hours or standard rate and in case of indirect workers, normal idle time is considered for the computation of overhead rate.
(ii) Abnormal idle time: There may be some factors which may give rise to abnormal idle time such as lack of coordination, power failure, machine breakdown, non-availability of raw materials, strikes, lockouts, poor supervision, fire, flood etc.
Abnormal idle time cost is not included as a part of production cost, but it is shown as a separate item in the Costing Profit and Loss Account.
Question 5.
Discuss the effect of overtime payment on productivity. [CA Inter Nov 2001, 3 Marks]
Answer:
Effect of overtime payment on productivity:
Overtime work should be resorted to, only when it is extremely essential because it involves extra cost. The overtime payment increases the cost of production in the following ways:
- The overtime premium paid is an extra payment in addition to the normal rate.
- The efficiency of operators during overtime work may fall and thus output may be less than normal output.
- In order to earn more, workers may not concentrate on work during normal time and thus the output during normal hours may also fall.
- Reduced output and increased premium of overtime will bring about an increase in costs of production.
Question 6.
Discuss the treatment of overtime premium in Cost Accounting. [CA Inter May 2008, May 2006, Nov. 2004, May 2003, 3 Marks]
Answer:
- If overtime is resorted to at the desire of the customer, then overtime premium may be charged to the job directly.
- If overtime is required to cope with general production programmes or for meeting urgent orders, the overtime premium should be treated as overhead cost of the particular department or cost centre which works overtime.
- If overtime is worked in a department due to the fault of another department, the overtime premium should be charged to the latter department.
- Overtime worked on account of abnormal conditions such as flood, earthquake etc., should not be charged to cost, but to Costing Profit and Loss Account.
Question 7.
State the circumstances in which time rate system of wage payment can be preferred in a factory. [CA Inter Nov 2001, 3 Marks]
Answer:
Time rate system of wage payment is suitable for the employees:
- whose services cannot be directly or tangibly measured, e.g. general helpers, supervisory and clerical staff etc.
- engaged on highly skilled jobs.
- where the pace of output is independent of the operator e.g., automatic chemical plants.
Question 8.
Describe briefly, how wages may be calculated under the following systems:
(i) Rowan system
(ii) Halsey system. [CA Inter Nov 2008, 9 Marks}
Answer:
(i) Rowan System: Under the Rowan system, a standard time allowance is fixed for the performance of a job and bonus is paid if time is saved. Under Rowan System the bonus is that proportion of the time wages as time saved bears to the standard time.
Time taken × Rate per hour + Time saved Time allowed × Time taken × Rate per hour
(ii) Halsey System: Under the Halsey system, a standard time is fixed for
each job or process and the workers are encouraged to do the job in less than the standard time. If there is no saving on this standard time allowance, the worker is paid only his day rate. He gets his time rate even if he exceeds the standard time limit, since his day rate is guaranteed. If, however, he does.the job in less than the standard time, he gets a bonus of 50% of the wages of time saved; the employer benefits by the other 50%.
Time taken × Time rate + 50% of time saved × Time rate.
Question 9.
Which is better plan out of Halsey 50% bonus scheme and Rowan bonus scheme for an efficient worker? In which situation the worker get came bonus in both schemes? [CA Inter May 2010, 3 Marks]
Answer:
Rowan Bonus Scheme pays more bonus if the time saved is below 50% of time allowed and if the time saved is more than 50% of time allowed then Halsey bonus scheme pays more bonus. Generally, time saved by a worker is not more than 50% of time allowed. So, the Rowan bonus scheme is better for an efficient worker. When the time saved is equal to 50% of time allowed then both plans pays same bonus to a worker.
Bonus under Halsey Plan = Time saved × 50% × Time rate
Bonus under Rowan Plan
Time taken Time allowed × Time saved × Rate per hour
Bonus under Halsey Plan will be equal to the Bonus under Rowan Plan when the following condition holds good:
Time saved × 50% × Time rate = Time taken Time allowed × Time saved × Time rate
50% = Time taken Time allowed
Hence, when the actual time taken is 50% of the time allowed, the bonus under Halsey and Rowan Plans is equal.
Question 10.
List important factors which must be taken into consideration for increasing labour productivity. [CA Inter May 2018, 4 Marks]
Answer:
The important factors which must be taken into consideration for increasing labour productivity are as follows:
- Employing only those workers who possess the right type of skill.
- Placing a right type of man on the right job.
- Training young and old workers by providing them the right types of opportunities.
- Taking appropriate measures to avoid the situation of excess or shortage of labour at the shop floor.
- Carrying out work study for the fixation of wage rate, and for the simplifi-cation and standardisation of work.
Question 11.
What do you understand by labour turnover? How is it measured? [CA Inter Nov.2014, Nov. 2010, Nov. 2004, May 2003, 5 Marks]
Answer:
Employee turnover or labour turnover in an organisation is the rate of change in the composition of employee force during a specified period measured against a suitable index.
The standard of usual employee turnover in the industry or locality or the employee turnover rate for a past period may be taken as the index or norm against which actual turnover rate is compared.
The methods for measuring labour turnover are:
(i) Replacement Method: This method takes into consideration actual replacement of employees irrespective of number of persons leaving
the organisation.
Note: New employees appointed on account of expansion plan of the organisation are not included in number of replacements.
(ii) Separation Method: In this method employee turnover is measured by dividing the total number of employees separated during the period by the average total number of employees on payroll during the same period.
(iii) Flux Method: This method takes both the number of replacements as well as the number of separations during the period into account for calculation of employee turnover.
When number of accessions are considered for measuring employee turnover, the employee turnover rate by Flux method may be computed by using any one of the following expressions:
Question 12.
Enumerate the causes of labour turnover. [CA Inter May 2011, 4 Marks]
Answer:
The main causes of labour turnover in an organisation/industry can be broadly classified under the following three heads:
(a) Personal Causes: These are the causes which induce or compel workers to leave their jobs such as change of jobs for betterment; premature retirement due to ill health or old age; domestic problems and family responsibilities; discontent over the jobs and working environment.
(b) Unavoidable Causes: These are the causes under which it becomes obligatory on the part of management to ask one or more of their employees to leave the organisation such as seasonal nature of the business; shortage of raw material, power, slack market for the product; change in the plant location; marriage (generally in the case of women) etc.
(c) Avoidable Causes: These are the causes which require the attention of management on a continuous basis so as to keep the labour turnover ratio as low as possible. The main causes are dissatisfaction with job, remuneration, hours of work, working conditions; strained relationship with management, supervisors or fellow workers; lack of training facilities and promotional avenues; low wages and allowances.
Question 13.
Discuss the two types of cost associated with labour turnover. [CA Inter Nov. 20033 Marks]
Answer:
The two types of costs associated with labour turnover are:
(a) Preventive Costs: These costs are incurred to prevent employee turnover or keep it as lowest as possible. It includes cost of medical benefit provided to the employees, cost incurred on employees’ welfare like pension etc., cost on other benefits with an objective to retain employees.
(b) Replacement Costs: These are the costs which arise due to employee turnover. If employees leave soon after they acquire the necessary’ training and experience of good work, additional costs will have to be incurred on new workers, i e., cost of recruitment, training and induction, abnormal breakage and scrap and extra wages and overheads due to the inefficiency of new workers.
A company will incur very high replacement costs if the rate of employee turnover is high. Similarly, only adequate preventive costs can keep Employee turnover at a low level. Therefore, each company must work out the optimum level of Employee turnover keeping in view its personnel policies and the behaviour of replacement cost and preventive costs at various levels of Employee turnover rates.
Question 14.
Describe the remedial steps to be taken to minimize the labour turnover. [CA Inter May 2019, Nov. 2007, 4 Marks]
Answer:
The following steps are useful for minimizing labour turnover:
- Exit interview: An interview to be arranged with each outgoing employee to ascertain the reasons of his leaving the organisation.
- Job analysis and evaluation: to ascertain the requirement of each job.
- Organisation should make use of a scientific system of recruitment, placement and promotion for employees.
- Organisation should create healthy atmosphere, providing education, medical and housing facilities for workers.
- Committee for settling workers grievances.
Practical Questions
Calculation of Employee Cost With Idle Time
Question 1.
Following data have been extracted from the books of M/’s. ABC Private Limited:
(i) Salary (each employee, per month) | ₹ 30.000 |
(ii) Bonus | 25% of salary |
(iii) Employer’s contribution to PF, ESI etc. | 15% of salary |
(ir) Total cost at employees’ welfare activities | 6,61,500 per annum |
(v) Total leave permitted during the year | 30 days |
(vi) No. of employees | 175 |
(vii) Normal idle time | 70 hours per annum |
(viii) Abnormal idle time (due to failure of power supply) | 50 hours |
(ix) Working days per annum | 310 days of 8 hours |
You are required to calculate:
(i) Annual cost of each employee
(ii) Employee cost per hour
(iii) Cost of abnormal idle time, per employee. [CA Inter Nov 2018, 5 Marks]
Answer:
(i) Calculation of Annual Cost of each employee
₹ | |
Salary (₹ 30,000 × 12) | 3,60,000 |
Bonus (25% of salary) | 90,000 |
Contribution to PF, ESI (15% of salary) | 54,000 |
Cost of employees welfare activities (₹ 6,61,500/175 employees) | 3,780 |
Total Annual cost of each employee | 5,07,780 |
(ii) Calculation of Employee cost per hour
Hours | |
Working Hours (310 days × 8 hours) | 2,480 |
Less: Employee leave hours (30 days × 8 hours) | 240 |
Available working Hours | 2,240 |
Less: Normal Idle Time | 70 |
Effective Working Hours | 2,170 |
Employee Cost per Hour = ₹ 5,07,780/2,170 hours = ₹ 234
Note: It is assumed that 310 working days does not include leave days permitted to the employees.
(iii) Cost of abnormal idle time, per employee will be ₹ 11,700 (₹ 234 × 50 hours).
Incentive Plans: Rowan And Halsey
Question 2.
X executes a piece of work in 120 hours as against 150 hours allowed to him. His hourly rate is ₹ 10 and he gets a dearness allowance ₹ 30 per day of 8 hours worked in addition to his wages. You are required to calculate total wages received by X under the Rowan Premium Plan. [CA Inter Nov 2011, 5 Marks]
Answer:
Rowan Premium Plan:
₹ | |
Normal wages (₹ 10 × 120 hrs) | 1,200 |
Dearness allowance (120 hrs/8 hrs × ₹ 30) | 450 |
Bonus 30hrs150hrs × 120 hrs × ₹ 10 150 hrs | 240 |
Total Wages | 1,890 |
Question 3.
Rowan Premium Bonus system does not motivate a highly efficient worker as a less efficient worker and a highly efficient worker can obtain same bonus under this system. Discuss with an example.
Answer:
In Rowan premium bonus system a worker cannot increase his earnings or bonus by merely increasing its work speed. The reason for this is that the bonus under Rowan Scheme is maximum when the time taken by worker on a job is half of the time allowed.
Example:
Time allowed – 10 hours
Time rate – ₹ 20.00
Time taken by Mr. X (highly efficient worker) – 4 hours
Time taken by Mr. Y (less efficient worker) – 5 hours
Now,
Bonus to Mr. X = AH / SH (SH – AH) × R = 4/10(10 – 4) × 20 = ₹ 48
Bonus to Mr. Y = AH / SH (SH – AH) × R = 5/10(10 – 5) × 20 = ₹ 50
Hence it can be said that under Rowan Premium Bonus System even a highly efficient worker can get same bonus as a less efficient worker.
Question 4.
A worker takes 15 hours to complete a piece of work for which time allowed is 20 hours. His wage rate is ? 5 per hour. Following additional in-formation are also available:
Material cost of work | ₹ 50 |
Factory overheads | 100% of wages |
Calculate the factory cost of work under the following methods of wage payments:
(i) Rowan Plan
(ii) Halsey Plan [CA Inter May 2018, 5 Marks]
Answer:
Calculation of Factory Cost of Work:
Rowan Plan (₹) | Halsey Plan (₹) | |
Materials Direct Wages (Refer W.N.) |
50 93.75 |
50 87.50 |
Prime Cost Factory Overheads (100% of Direct Wages) |
143.75 93.75 |
137.50 87.50 |
Factory Cost | 237.50 | 225.00 |
Working Note:
Calculation of Direct Wages:
Rowan Plan = Time Taken × Rate per hour + Time saved Time Allowed × Time Taken × Rate per hour
= 15 hours × 5 + 5 hours 20 hours × 15 hours × 5
= 93.75
Halsey Plan = Time Taken × Time Rate + 50% of Time Saved × Time Rate
= 15 hours × 5 + (50% of 5 hours) × 5
= 87.50
Question 5.
A skilled worker is paid a,guaranteed wage rate of ₹ 150 per hour. The standard time allowed for a job is 50 hours. He gets an effective hourly rate of wages of ₹ 180 under Rowan Incentive Plan due to saving in time. For the same saving in time, calculate the hourly rate of wages he will get, if he is placed under Halsey Premium Scheme (50%). [CA Inter Nov 2017, May 2013, Nov 2009, 5 Marks]
Answer:
Increase in hourly rate of wages under Rowan Plan is ₹ 30 ie. (₹ 180 – ₹ 150)
Time saved Time Allowed × ₹ 150 = ₹ 30 (Refer Working Note)
Or, Time saved Time Allowed × ₹ 150 = ₹ 30
Or, Time Saved = ₹30×50 hours ₹150 = 10 hours
Therefore, Time Taken is 40 hours i.e. (50 hours – 10 hours)
Effective Hourly Rate under Halsey System:
Time Saved = 10 Hours
Bonus 50% = 10 hours × 50% × ₹ 150 = ₹ 750
Total wages = ₹ 150 × 40 hours + ₹ 750 = ₹ 6,750
Effective hourly rate = ₹ 6,750/40 = ₹ 168.75
Working Note:
Effective Hourly Rate
Question 6.
You are given the following information of a worker:
(i) Name of worker | ‘X’ |
(ii) Ticket No. | 002 |
(iii) Work started | 1-4-20 at 8 a.m. |
(iv) Work finished | 5-4-20 at 12 noon |
(v) Work allotted | Production of 2,160 units |
(vi) Work done and approved | 2,000 units |
(vii) Time and units allowed | 40 units per hour |
(viii) Wages rate | ₹ 25 per hour |
(ix) Bonus | 40% of time saved |
(x) Worker X worked | 9 hours a day |
You are required to calculate the remuneration of the following basis:
(i) Halsey plan and
(ii) Rowan plan [CA Inter May 2011, 5 Marks]
Answer:
No. of units, produced and approved = 2,000
Standard time = 40 units per hour
Hourly Wages Rate = 25
Time allowed = 40 units per hour
Time allowed for 2,000 units = 2,00040 = 50 hours
(i) Calculation of Remuneration under Halsey Plan:
Standard time allowed for 2,000 units Actual time taken for 2,000 units |
50 hours 40 hours |
Time saved (W.N.2) | 10 hours |
Basic wages for time taken (40 hours @ ₹ 25) Bonus (40% of time saved of 10 hrs × ₹ 25) |
₹ 1,000 ₹ 100 |
Total | ₹ 1,100 |
(ii) Calculation of Remuneration Under Rowan Plan:
Basic wages for time taken (40 hours @ ₹ 25) = ₹ 1,000
Bonus = 4050 × 10 × ₹ 25 = ₹ 200
Total = ₹ 1,200
9 hrs per day from 1.4.2020 to 4.4.2020 ie. 36 hrs + 4 hrs on 5.4.2020 = 40 hrs.
Question 7.
M/s. Zeba Private Limited allotted a standard time of 40 hours for a job and the rate per hour is 75, The actual time taken by a worker is 30 hours.
You are required to calculate the total earnings under the following plans:
(i) Halsey Premium Plan (Rate 50%)
(ii) Rowan Plan
(Hi) Time Wage System
(iy) Piece Rate System [CA Inter May 2019, 5 Marks]
Answer:
(i) Halsey Premium Plan:
= Time taken × Time Rate + 50% of time saved × time rate
= (30 hrs × ₹ 75) + (40 hrs – 30 hrs) × 50% ₹ 75
= ₹ 2,625
(ii) Rowan Plan:
= Time taken × Rate per hour + Time saved Time Allowed × Time taken × Rate per hour
= 30 hours × ₹ 75 + 10hrs40hrs × 30 hrs × ₹ 75
= ₹ 2,812.50
(iii) Time Wage System:
= Hours Work × Rate Per hour
= 30 hours × ₹ 75
= ₹ 2,250
(iv) Piece Rate System:
Std. Time × Rate per hour
= 40 × ₹ 75 = ₹ 3,000
Question 8.
Zico Ltd. has its factory at two locations viz Nasik and Satara. Rowan plan is used at Nasik factory and Halsey plan at Satara factory. Standard time and basic rate of wages are same for a job which is similar and is carried out on similar machinery. Normal working hours is 8 hours per day in a 5 day week.
Job in Nasik factory is completed in 32 hours while at Satara factory it has taken 30 hours. Conversion costs at Nasik and Satara are ₹ 5,408 and ₹ 4,950. Overheads account for ₹ 25 per hour.
Required:
(i) To. find out the normal wages; and
(ii) To compare the respective conversion costs. [CA Inter Nov. 2019, 10 Marks]
Answer:
Calculation of Total labour costs at both the factories
Nasik | Satara | |
Hours worked Conversion Costs Less: Overheads |
32 hrs. ₹ 5,408 ₹ 800 (₹ 25 × 32 hrs.) |
30 hrs. ₹ 4,950 ₹ 750 (₹ 25 × 30 hrs.) |
Labour Costs | ₹ 4,608 | ₹ 4,200 |
(i) Calculation of Normal wages rate:
Let Wage rate be ₹ R per hour which is same for both the Nasik and Satara factory.
Normal time allowed for completing the job is 40 hours i.e. 8 hours per day × 5 days.
Normal wage rate can be found out taking total cost of either factory.
Nasik: Rowan Plan
Total Labour Cost = Wages for hours worked + Bonus as per Rowan plan
₹ 4,608 = Time taken × Rate per hour + Time saved Time Allowed × Time taken × Rate per hour
₹ 4,608 = 32 hrs × R + 40−3240 × 32 × R
₹ 4,608 = 32R + 6.4R
R = ₹ 120 per hour
OR
Satara: Halsey Plan
Total Labour Cost = Wages for hours worked + Bonus as per Halsey plan
₹ 4,200 = Time taken × Time Rate + 50% of time saved × time rate
₹ 4,200 = 30 hrs × R + 50% of (40 hrs – 30 hrs) × R
₹ 4,200 – 35 R
R = ₹ 120
(ii) Comparative Statement of respective conversion costs
Nasik (₹) | Satara (₹) | |
Normal Wages | 3,840 (₹ 120 × 32) | 3,600 (₹ 120 × 30) |
Bonus | 768 (6.4 × ₹ 120) | 600 (5 × ₹ 120) |
Factory overhead | 800 | 750 |
Conversion costs | 5,408 | 4,950 |
Question 9.
Two workmen, A and B, produce the same product using the same material. A is paid bonus according to Halsey plan, while B is paid bonus according to Rowan plan. The time allowed to manufacture the product is 100 hours. A has taken 60 hours and B has taken 80 hours to complete the product. The normal hourly rate of wages of workman A is ₹ 24 per hour. The total earnings of both the workers are same. Calculate normal hourly rate of wages of workman B. [CA Inter May 2009, 2 Marks]
Answer:
Now, it is said that the total earnings of both the workers are same and therefore,
Total earnings of A = Total earnings of B
1,920 = 96R
R = 1,920/96
R = 20
So, the hourly rate of wages of the worker B is ₹ 20 per hour.
Question 10.
A skilled worker is paid a guaranteed wage rate of ? 120 per hour. The standard time allowed for a job is 6 hour. He took 5 hours to complete the job. He is paid wages under Rowan Incentive Plan.
(i) Calculate his effective hourly rate of earnings under Rowan Incentive Plan.
(ii) If the worker is placed under Halsey Incentive Scheme (50%) and he wants to maintain the same effective hourly rate of earnings, calculate the time in which he should complete the job. [CA Inter Dec. 2021, May 2013, 5 Marks]
Answer:
(i) Effective hourly rate of earnings under Rowan Incentive Plan Earnings under Rowan Incentive plan
= Actual Time Taken × Wage rate + Time saved Time Allowed × Time Taken × Wage Rate
= (5 hours × ₹ 120) + 1 hour 6 hours × 5 hours × ₹ 120
= ₹ 600 + ₹ 100 = ₹ 700
Effective Hourly Rate = ₹ 700/5 hours = ₹ 140/hour
(ii) Let time taken = T
Or, 140T = 120T + 360 – 60T
Or, 80T = 360
Or, T = 36080 = 4.5 hours
Therefore, to earn effective hourly rate of ₹ 140 under Halsey Incentive Scheme-worker has to complete the work in 4.5 hours.
Question 11.
Two workmen ‘A’ and ‘B’, produce the same product using the same material. Their normal wage rate is also the same. ‘A’ is paid bonus according to the Rowan system, while ‘B’ is paid bonus according to the Halsey system. The time allowed to make the product is 50 hours. ‘A’ takes 30 hours while ‘B’ takes 40 hours to complete the product. The factory overhead rate is 5 per man-hour actually worked. The factory cost for the product for ‘A is ₹ 3,490 and for ‘B’ it is ₹ 3,600.
Required:
(a) Compute the normal rate of wages;
(b) Compute the cost of materials cost;
(c) Prepare a statement comparing the factory cost of the products as made by the two workmen. [ICAJModule] .
Answer:
Let X be the cost of material and Y be the normal rate of wages per hour. Bonus:
Workman A under Rowan plan = 2050 × 30 × Y = 12Y
Workman B under Halsey plan = 50% of (50 – 40) × Y = 5Y
Factory cost = Material cost + Wages + Bonus + Overhead For Workman A:
X + 30Y + 12Y + (30 hrs. × ₹ 5) = ₹ 3,490
X + 42Y + ₹ 150 = ₹ 3,490
X + 42Y = ₹ 3,340 ……………………….. equation (i)
For Workman B:
X + 40Y + 5Y + (40 hrs. × ₹ 5) = ₹ 3,600
X + 45Y + ₹ 200 = ₹ 3,600
Subtracting equation (i) from equation (ii)
Therefore, normal rate of wages is ₹ 20 per hour.
X + 45Y = ₹ 3,400
X + (45 × 20) = ₹ 3,400
X = ₹ 2,500
Therefore, the cost of material is ₹ 2,500.
Comparative Statement of the Factory Cost of two workmen
Question 12.
The management of a company wants to formulate an incentive plan for the workers with a view’ to increase productivity. The following particulars have been extracted from the books of company.
Piece Wage rate ₹ 10
Weekly working hours 40
Hourly wages rate ₹ 40 (guaranteed)
Standard/normal time taken per unit is 15 minutes.
Actual output for a week:
Worker A 176 pieces
Worker B 140 pieces
Differential piece rale: 80% of piece rate when output below normal and 120% of piece rate when output above normal.
Under Halsey scheme, worker gets a bonus equal to 50% of Wages of time saved.
Calculate the earnings of workers under Halsey’s and Rowan’s premium scheme. [CA Inter May 2012, 8 Marks]
Answer:
Calculation of earnings for workers under different incentive plans:
Halsey’s Premium Plan:
Rowan’s Premium Plan:
Worker A | Worker B | |
Minimum Wages | ₹ 1,600 | ₹ 1,600 |
Bonus 4hrs44hrs × 40 hrs × ₹ 40 = 145.45 | No Bonus | |
Earning | 1745.45 | 1,600 |
Question 13.
The finishing shop of a company employs 60 direct workers. Each worker is paid ₹ 400 as wages per week of 40 hours. When necessary, over-time is worked up to a maximum of 15 hours per week per worker at time rate plus one-half as premium. The current output on an average is 6 units per man hour which may be regarded as standard output. If bonus scheme is introduced, it is expected that the output will increase to 8 units per man hour. The workers will, if necessary, continue to work Overtime up to the specified limit although no premium on incentives will be paid.
The company is considering introduction of either Halsey Scheme or Rowan Scheme of Wage Incentive system. The budgeted weekly output is 19,200 units. The selling price is ₹ 11 per unit and the direct Material Cost is ₹ 8 per unit. The variable overheads amount to ₹ 0.50 per direct labour hour and the fixed overhead is ₹ 9,000 per week.
Prepare a Statement to show the effect on the Company’s weekly Profit of the proposal to introduce (a) Halsey Scheme, and (b) Rowan Scheme. [CA Inter May 2002, 8 Marks]
Answer:
Present System:
Normal wage rate (₹ 400/40 hours) | ₹ 10 per hour |
Overtime Rate (Normal rate + 50%) | ₹ 15 per hour |
Average current output per hour | 6 units |
Hours to be worked for budgeted weekly output (19,200 units/6) | 3200 man hours |
Total normal hours available in a week (60 workers × 40 hours) | 2,400 man hours |
Overtime required to be worked (3,200 hours – 2,400 hours) | 800 man hours |
Calculation of total wages under the present scheme
₹ | |
Normal wages for total hours worked (3,200 hours × ₹ 110 per hour) | 32,000 |
Add: Overtime Premium (800 hours × ₹ 5 per hour (₹ 15 – ₹ 10) | 4,000 |
Proposed scheme:
Time taken for 19,200 units = 19,200/8 = 2,400 man hours
Time saved = 3,200 – 2,400 = 800 man hours
Total wages under the proposed scheme:
(i) Under Halsey Scheme:
₹ | |
Normal wages for total hours worked (2,400 hours × ₹ 10 per hour) | 24,000 |
Add: Bonus (800 hours × 50% × ₹ 10 per hour) | 4,000 |
Total | 28,000 |
(ii) Under Rowan Scheme:
₹ | |
Normal wages for total hours worked (2,400 hours × ₹ 10 per hour) | 24,000 |
Add: Bonus (800 hours × 2,400/3,200 × ₹ 10 per hour) | 6,000 |
Total | 30,000 |
Statement of Profit
Question 14.
ZED Limited Is working by employing 50 skilled workers. It is considered the introduction of incentive scheme-either Halsey scheme (with 50% bonus) or Rowan scheme of wage payment for increasing the labour productivity to cope up the Increasing demand for the product by 40%. It is believed that proposed incentive scheme could bring about an average 20% Increase over the present earnings of the workers; If could act as sufficient incentive for them to produce more.
Because of assurance, the increase In productivity has been observed as revealed by the figures for the month of April, 2020.
Hourly rate of wages (guaranteed) ₹ 30
Average time for producing one unit by one worker at the previous performance (This may be taken as time allowed) 1.975 hours
Number of working hours per day of each worker | 8 |
Number of working days in the month | 24 |
Actual production during the month | 6,120 |
Required:
(i) Calculate the effective rate of earnings under the Halsey scheme and the Rowan scheme,
(ii) Calculate the savings to the ZED Limited in terms of direct labour cost per piece.
(iii) Advise ZED Limited about the selection of the scheme to fulfil his assurance. [CA Inter May 2004, 8 Marks]
Answer:
Working Notes:
1. Computation of time saved (in hours) per month:
= Standard production time of 6,120 units – Actual time taken by the workers
= (6,120 units × 1.975 hrs. – 24 days × 8 hours/day × 50 skilled workers)
= 12,087 hrs. – 9,600 hrs.
= 2,487 hours
2. Computation of bonus for time saved (in hours) under Halsey & Rowan Plan:
Time saved = 2,487 hrs.
Wage rate = ₹ 30 per hour
Bonus under Halsey Scheme = 2,487 hrs. × 50% × ₹ 30 = ₹ 37,305
Bonus under Rowan scheme = 2,487hrs.12,087hrs. × 9,600 hrs × ₹ 30
= ₹ 59,258
(i) Computation of effective rate of earning under the Halsey & Rowan Scheme
Total earnings under Halsey Scheme = Time wages + Bonus
(W.N.2) = 24 days × 8 hrs × 50 skilled × ₹ 30 + ₹ 37,305
= ₹ 3,25,305
Effective earnings rate per hour = ₹ 3,25,305/9,600 hrs = ₹ 33.89
Total earning under Rowan Scheme = Time wages + Bonus
(W.N.2) = 2,88,000 + 59.258
= ₹ 3,47,258
Effective earnings rate per hour = ₹ 3,47,258/9,600 hrs = ₹ 36.17
(ii) Saving to ZED Ltd. in direct labour cost per piece:
Direct labour cost per unit under times wages system ₹ 59.25
(1.975 times per unit × ₹ 30)
Direct labour cost per unit under Halsey Plan ₹ 53.15
(₹ 3,25,305/6,120 units)
Direct labour cost per unit under Rowan plan ₹ 56.74
(₹ 3,47,258/6,120 units)
Savings of direct labour cost per piece under:
Halsey Plan (₹ 59 25 – ₹ 53.15) ₹ 6.10
Rowan Plan (₹ 59.25 – ₹ 56.74) ₹ 2.51
(iii) Advised to ZED Ltd:
Halsey scheme brings more saving to the management of ZED Ltd. over the present earning of ? 2,88,000, but the other scheme Le. Rowan fulfil the promise of 2096 increase over the present earnings of ₹ 2,88,000 by paying 20.58% in the form of Bonus. Hence, Rowan Plan should be adopted.
Question 15.
The existing Incentive system of Alpha Limited is as under:
Normal working week | 5 days or 8 hours each plus 3 late shifts of 3 hrs. each |
Rate of Payment | Day work: 160 per hour Late shift: 225 per hour |
Average output per operator for 49 hours week i.e. including 3 late shifts. | 120 articles |
In order to increase output and eliminate Overtime, it was decided on to a system of payment by results. The following information is obtained.
Time rate (as usual) | 60 per hour |
Basic time allowed for 15 articles | 5 hours |
Piece-work rate | Add 20% to basic piece- rate |
Premium Bonus | Add 50% to time. |
Required:
Prepare a Statement showing hours worked, weekly earning, number of articles produced and labour cost per article for one operator under the following systems:
(a) Existing time-rate
(b) Straight piece-work
(c) Rowan system
(d) Haisey premium system .
Assume that 135 articles are produced in a 40-hour week under straight piece work, Rowan Premium system, and Halsey premium system above and workers earn half the time saved under Halsey premium system. [CA Inter Nov 2005, 8 Marks]
Answer:
Table showing Labour Cost per Article
Working Notes:
Existing time rate:
Weekly wages 40 hrs @ ₹ 160/hr
9 hrs @ ₹ 225/hr
Price rate system:
Basic Time is 5 hours for 15 articles
Cost of 15 articles at hourly rate of 160/hr.
Add: 20%
Therefore, Rate per article = ₹ 960/15 = ₹ 64
Earnings for the week = 135 articles × ₹ 64 = ₹ 8,640
Rowan premium System:
Basic Time 5 hrs for 15 articles
Add: 50% to time (m)
Total time 7.5 hrs for 15 articles or 30 minutes per article
Time allowed for 135 articles = 67.5 hrs.
Actual time taken for 135 article = 40 hrs.
Earnings = Time Taken × Rate per hour + Time saved Time Allowed × Time Taken
= 40 hrs × ₹ 160 + 67.5hrs−40hrs67.5hrs × 40 hrs × ₹ 160
= 9,007.41
Halsey premium system:
Earnings = Time Taken × Time Rate + 50% of Time Saved × Time Rate
= 40 hrs × ₹ 160 + 50% of 27.5 hrs (67.5 hrs – 40 hrs) × ₹ 160
= ₹ 8,600
Labour Turnover
Question 16.
The information regarding number of employees on roll in a shopping mall for the month of December, 2020 are given below:
Number of employees as on 01-12-2020 | 900 |
Number of employees as on 31-12-2020 | 1,100 |
During December, 2020, 40 employees resigned and 60 employees were discharged. 300 employees were recruited during the month. Out of these 300 employees, 225 employees were recruited for an expansion project of the mall and rest were recruited due to exit of employees.
Assuming 365 days in a year, calculate Employee Turnover Rate and Equivalent Annual Employee Turnover Rate by applying the following:
(i) Replacement Method
(ii) Separation Method
(iii) Flux Method [CA Inter May 2018, May 2001, 10 Marks]
Answer:
(i) Replacement Method:
Employee Turnover Rate
= Number of employees Replaced during the period Average number of employees during the period on roll × 100
= 751,000 × 100 = 7.5%
Equivalent Annual Turnover Rate = 7.5931 × 365 = 88.31%
(ii) Separation Method:
Employee Turnover Rate
= Number of employees Separated during the period Average Number of employees during the period on roll × 100
= 40+601,000 × 100 = 10%
Equivalent Annual Turnover Rate = 10%31 × 365 = 117.7496
(iii) Flux Method:
Employee Turnover Rate
Question 17.
Following information is given of a newly setup organisation for the year ended on 31st march, 2021.
Number of workers replaced during period | 50 |
Number of workers left and discharged during the period | 25 |
Average Number of workers on the roll during the period | 500 |
You are required to:
(i) Compute the employee turnover rates using Separation Method and Flux Method.
(ii) Equivalent Employee Turnover Rates for (i) above, given that the organisation was setup on 31st January, 2021. [CA Inter July 2021, 5 Marks]
Answer:
(i) Employee Turnover Rates using Separation Method and Flux Method
(ii) Equivalent Employee Turnover Rates
Question 18.
RST Company Ltd. has computed labour turnover rates for the quarter ended on 31st March, 2020 as 20%, 10% and 5% under flux method, replacement method and separation method respectively, if the number of workers replaced during that quarter 1s50, find out (i) Workers recruited and joined (ii) Workers left and discharged and (iii) Average number of workers on roll, (iv) Number of workers at the beginning of the Quarter. [CA Inter May 2018, May 2017, Nov. 2013, Nov. 2O12 8 Marks]
Answer:
1. Average Number of workers on roll during the quarter:
Employee turnover rate using Replacement method
= No of Replacements Avg. No. of workers on roll
10% = 50 Avg. No. of workers on roll
Average Number of workers on roll = 500
2. Number of workers left and discharged:
Employee turnover rate using Separation method
No. of Separations = 25
3. Number of workers recruited and joined
Employee turnover rate under Flux Method
No. of workers recruited and joined = 75
4. No. of workers at the beginning of the Quarter:
Let workers at the beginning of the quarter were ‘X’
Average No. of workers on roll
Question 19.
Human Resources Department of A Ltd. computed labour turnover by replacement method at 3% for the quarter ended on June 2021. During the quarter, fresh recruitment of 40 workers wras made. The number of workers at the beginning and end of the quarter was 990 and 1,010 respectively.
You are required to calculate the labour turnover rate by Separation Method and Flux Method. [CA Inter Nov. 2015, 5 Marks]
Answer:
Labour Turnover by Replacement Method
Or, No. of workers replaced during the quarter = 0.03 × 1,000 = 30 workers
(i) Labour Turnover by Separation Method
(ii) Labour Turnover by Flux Method
Miscellaneous
Question 20.
The management of a company is worried about their increasing labour turnover in the factory and before analysing the causes and taking remedial steps, they want to have an idea of the profit foregone as a result of labour turnover in the last year.
Last year sales amounted to ₹ 83,03,300 and the profit-volume ratio was 20%. The total number of actual hours worked by the Direct Labour Force was 4.45 lakhs. As a result of the delays by the Personnel Department in filling vacancies due to labour turnover, 1,00,000 potentially productive hours (excluding unproductive training hours) were lost. The actual direct labour hours included 30,000 hours attributable to training new recruits, out of which half of the hours were unproductive.
The costs Incurred consequent on labour turnover revealed on analysis the following:
Settlement costs due to leaving ₹ 43 | 820 |
Recruitment costs ₹ 26 | 740 |
Selection costs ₹ 12 | 750 |
Training costs ₹ 30 | 490 |
Assuming that the potential production lost as a consequence of labour turnover could have been sold at prevailing prices, find the profit foregone last year on account of labour turnover. [CA Inter Nov 2019, Nov 2001, 5 Marks]
Answer:
Actual Production Hours:
Actual Hours worked (including hrs. attributable to training new recruits) 4,45,000
Less: Unproductive hours (30,000 ÷ 2) 15,000
Productive hours lost:
Loss of potential productive hours 1,00,000
Add: Unproductive training hours 15,000
Loss of contribution due to unproductive hours:
Contribution from 4,30,000 Productive Hrs.
(Sales value × PV ratio) = 83,03,300 × 20% = 16,60,660
Contribution from 1,15,000 productive hours lost
= 16,60,6604,30,000 × 1,15,000 = 4,44,130
Profit foregone as a result of labour turnover:
Contribution foregone = 4,44,130
Settlement costs due to leaving = 43,820
Selection costs = 12,750
Training costs = 30,490
Recruitment costs = 26,740
Question 21.
A Company is undecided as to what kind of wage scheme should be introduced. The following particulars have been compiled in respect of three systems, which are under consideration of the management:
For the purpose of piece rate, each minute is valued at ₹ 0.10. You are required to calculate the wages of each worker under:
(i) Guaranteed hourly rates basis
(ii) Piece work earnings basis, but guaranteed at 75% of basic pay (guaranteed hourly rate) If his earnings are less than 50% of basic pay.
(iii) Premium bonus basis where the worker receives bonus based on Rowan scheme. [CA Inter Nov. 2002, 9 Marks]
Answer:
(i) Computation of wages of each worker under guaranteed hourly rate basis
(ii) Computation of wages of each worker under piece work earnings basis
Since each worker has been guaranteed at 75% of basic pay, if his earnings are less than 50% of basic pay (guaranteed hourly rate), therefore, earning of the workers will be as follows Workers A and C will be paid the wages as computed viz., ₹ 228 and ₹ 315 respectively. The computed earnings under piece rate basis for worker B is ₹ 75 which is less than 50% of basic pay i.e., ₹ 100 (₹ 200 × 50) therefore he would be paid ₹ 150 Le. 75% × ₹ 200.
Working Notes:
1. Piece rate/per unit
2. Time allowed to each worker
Worker A = (21 units × 12 min) + (36 units × 18 min) + (46 units × 30 min)
= 2,280 min or 38 hours
Worker B = 25 units × 30 min
= 750 min or 12.5 hours
Worker C = (60 units × 12 min) + (135 units × 18 min)
= 3,150 min or 52.5 hours
(iii) Computation of wages of each worker under Premium bonus basis
(where each worker receives bonus based on Rowan Scheme)
Question 22.
Following are the particulars of two workers ‘R’ and ‘S’ for a month:
The normal working hours for the month are 200 hrs. Overtime is paid at double the total of normal wages and dearness allowance. Employer’s contribution to State Insurance and Provident Fund are at equal rates with employees’ contributions.
Both workers were employed on jobs A, B and C in the following proportions:
Overtime was done on job ‘A’
You are required to:
(i) Calculate ordinary wages rate per hour of ‘R’ and ‘S’.
(ii) Allocate the worker’s cost to each job ‘A’, ‘B’ and ‘C’. [CA Inter Nov. 2020, 6 Marks]
Answer:
(i) Calculation of Net Wages paid to Workers ‘R’ and ‘S’
Calculation of ordinary wage rate per hour of Workers ‘R’ and ‘S’
(ii) Statement Showing Allocation of workers cost to each Job
Working Note:
Normal Wages are considered as basic Wages
Question 23.
AD V Pvt. Ltd. manufactures a product which requires skill and precision in work to get quality products. The company has been experiencing high labour cost due to slow speed of work. The management of the company wants to reduce the labour cost but without compromising with the quality of work. It wants to introduce a bonus scheme but is indifferent between the Halsey and Rowan scheme of bonus.
For the month of November 2020, the company budgeted for 24,960 hours of work. The workers are paid ? 80 per hour.
Required: CALCULATE and suggest the bonus scheme where the time taken (in%) to time allowed to complete the works is
(a) 100%
(b) 75%
(c) 50% &
(d) 25% of budgeted hours. [CA Inter Nov 2019, RTPJ
Answer:
The Cost of labour under the bonus schemes are tabulated as below:
Bonus under Halsey Plan = 50% of (Time Allowed – Time Taken) × Rate per hour
Bonus under Rowan Plan= Time saved Time Allowed × Time Saved Rate per hour
Rowan scheme of bonus keeps checks on speed of work as the rate of incentive increases only up to 50% of time taken to time allowed but the rate decreases as the time taken to time allowed comes below 50%. It provides incentives for efficient workers for saving in time but also puts check on careless speed. On implementation of Rowan scheme, the management of ADV Pvt. Ltd. would resolve issue of the slow speed work while maintaining the skill and precision required maintaining the quality of product.
Question 24.
IBL Sisters operates a boutique which works for various fashion houses and retail stores. It has employed 26 workers and pays them on time rate basis. On an average an employee is allowed 8 hours for boutique work on a piece of garment. In the month of December 2020, two workers M and J were given 15 pieces and 21 pieces of garments respectively for boutique work. The following are the details of their work:
M | J | |
Work assigned | 15 pcs. | 21 pcs. |
Time taken | 100 hours | 140 hours |
Workers are paid bonus as per Halsey System. The existing rate of wages is ₹ 60 per hour. As per the new wages agreement the workers will be paid 172 per hour w.e.f. 1st January 2021. At the end of the month December 2020, the accountant of the company has wrongly calculated wages to these two workers taking ₹ 72 per hour.
Required:
(i) Calculate the loss incurred due to incorrect rate selection.
(ii) Calculate the loss incurred due to incorrect rate selection, had Rowan scheme of bonus payment followed.
(iii) Calculate the loss/savings if Rowan scheme of bonus payment had followed.
(iv) Discuss the suitability of Rowan scheme of bonus payment for JBL Sisters? [CA Inter May 2021, RTP]
Answer:
(i) Calculation of loss incurred due to incorrect rate selection
(While calculating loss only excess rate per hour has been taken)
(ii) Calculation of loss incurred due to incorrect rate selection had Rowan scheme of bonus payment followed:
(iii) Calculation of amount that could have been saved if Rowan Scheme were followed
M (₹) | J(₹ ) | Total (₹) | |
Wages paid under Halsey Scheme | 1,320 | 1,848 | 3,168 |
Wages paid under Rowan Scheme | 1,400 | 1,960 | 3,360 |
Difference (loss) | (80) | (112) | (192) |
(iv) Rowan Scheme of incentive payment has the following benefits, which is suitable with the nature of business in which JBL Sisters operates:(a) Under Rowan Scheme of bonus payment, workers cannot increase their earnings or bonus by merely increasing its work speed. Bonus under Rowan Scheme is maximum when the time taken by a worker on a job is half of the time allowed. As this fact is known to the workers, therefore, they work at such a speed which helps them to maintain the quality of output too.
(b) If the rate setting department commits any mistake in setting standards for time to be taken to complete the works, the loss incurred will be relatively low.
Question 25.
GZ Ltd. pays the following to a skilled worker engaged in production works. The following are the employee benefits paid to the employee:
(a) Basic salary per day | ₹ 1,000 |
(b) Dearness allowance (DA) | 20% of basic salary |
(c) House rent allowance | 16% of basic salary |
(d) Transport allowance | ₹ 50 per day of actual work |
(e) Overtime | Twice the hourly rate (considers basic and DA), only if works more than 9 hours a day otherwise no overtime allowance. If works for more than 9 hours a day then overtime is considered after 8th hour. |
(f) Work of Holiday and Sunday | Double of per day basic rate provided works atleast 4 hours. The holiday and Sunday basic is eligible for all allowances and statutory deductions. |
(g) Earned leave & Casual leave | These are paid leave |
(h) Employer’s contribution to Provident fund | 12% of basic and DA |
(i) Employer’s contribution to Pension fund | 7% of basic and DA |
The company normally works 8-hour a day and 26 day in a month. The company provides 30 minutes lunch break in between.
During the month of August 2020, Mr. Z works for 23 days including 15th August and a Sunday and applied for 3 days of casual leave. On 15th August and Sunday he worked for 5 and 6 hours respectively without lunch break.
On 5th and 13th August he Worked for 10 and 9 hours respectively. During the month Mr. Z worked for 100 hours on Job no. HT 200.
You are required to calculate:
(i) Earnings per day
(ii) Effective wages rate per hour of Mr, Z
(iii) Wages to be charged to Job no. HT 200. [CA Inter Nov. 2020, RTP]
Answer:
(i) Calculation of earnings per day
₹ | |
Basic salary (₹ 1,000 × 26 days) | 26,000 |
Dearness allowance (20% of basic salary) | 5,200 |
31,200 | |
House rent allowance (16% of basic salary) | 4,160 |
Employer’s contribution to Provident fund (12% × ₹ 31,200) | 3,744 |
Employer’s contribution to Pension fund (7% × ₹ 31,200) | 2,184 |
41,288 |
(ii) ) Calculation of effective wage rate per hour of Mr. Z:
(iii) Calculation of wages to be charged to Job no. HT 200
= ₹ 240 × 100 hours = ₹ 24,800
Question 26.
Z Ltd. is working by employing 50 skIlled workers. It Is considering the introduction of an Incentive scheme . either Halsey Scheme (with 50% Bonus) or Rowan Scheme – of wages payment for Increasing the labour productivity to adjust with the increasing demand for Its products by 40% The company feels that If the proposed Incentive scheme could bring about an average 20% increase over the present earnings of the workers, it could act as sufficient incentive for them to produce more and the company has accordingly given assurance to the workers.
Because of this assurance, an increase in productivity has been observed as revealed by the figures for the month of April, 2020:
Hourly rate of wages (guaranteed) | ₹ 50 |
Average time for producing one unit by one worker at the previous performance (ibis may be taken as time allowed) | 1.975 hours |
Number of working days in a month | 24 |
Number of working hours per day of each worker | 8 |
Actual production during the month | 6,120 units |
Required:
(i) Calculate the effective increase in earnings of workers in percentage terms under Halsey and Row an scheme.
(ii) Calculate the savings to Z Ltd. in terms of direct labour cost per unit under both the schemes.
(iii) Advise Z Ltd. about the selection of the scheme that would fulflil its assurance of incentivizing workers and also to adjust with the increase in demand. [CA Inter January 2021, 10 Marks]
Answer:
Working Notes:
1. Total time wages of 50 workers per month
= No. of working days in the month × No. of working hours per day of each worker × Hourly rate of wages × No. of workers
= 24 days × 8 hrs. × ₹ 50 × 50 workers = ₹ 4,80,000
2. Time saved per month:
Time allowed per unit to a worker = 1.975 hours
No. of units produced during the month by 50 workers = 6,120 Units
Total time allowed to produce 6,120 units (6,120 × 1.975 hrs) = 12,087 hours
Actual time taken to produce 6,120 units (24 days × 8 hrs. × 50 workers) = 9,600 hours
Time saved (12,087 hours – 9,600 hours) = 2,487 hours
3. Bonus under Halsey scheme to be paid to 50 workers .
Bonus = (50% of time saved) × hourly rate of wages
= 50/100 × 2,487 hours × ₹ 50 = ₹ 62,175
Total wages to be paid to 50 workers is ₹ 5,42,175 (₹ 4,80,000 + ₹ 62,175), if Z Ltd, considers the introduction of Halsey.Incentive Scheme to increase the worker productivity.
4. Bonus under Rowan Scheme to be paid to 50 workers:
Bonus taken = Time saved Time Allowed × Time Saved × Hourly rate
= 9,600 hours 12,087 hours × 2,487 hrs × ₹ 50 = ₹ 9,764
Total wages to be paid to 50 workers are (₹ 4,80,000 + ₹ 98,764) ₹ 5,78,764, if Z Ltd. considers the introduction of Rowan Incentive Scheme to increase the worker productivity.
(i) (a) Effective hourly rate of earnings under Halsey scheme
(Refer to working Notes 1, 2 and 3)
(b) Effective hourly rate of earnings under Rowan scheme
(Refer to Working Notes 1, 2 and 4)
(ii) (a) Saving in terms of direct labour cost per unit under Halsey scheme:
(Refer to Working Note 3)
Labour cost per unit (under time wage scheme)
= 1.975 hours × ₹ 50 = ₹ 98.75
Labour cost per unit (under Halsey scheme)
= Total wages paid under the scheme Total number of units produced = ₹ = ₹ 88.60
Saving per unit = ₹ 98.75 – ₹ 88.60 = ₹ 10.15
(b) Saving in terms of direct worker cost per unit under Rowan Scheme:
(Refer to Working Note 4)
Labour cost per unit under Rowan scheme = ₹ 5,78,764/6,120 units = ₹ 94.57
Saving per unit = ₹ 98.75 – ₹ 94.57 = ₹ 4.18
(iii) Calculation of Productivity
Normal Production Hours worked/Unit per Hour (9,600/1.975) | 4,861 |
Actuals Production Units | 6,120 |
Increase in labour productivity | 1,259 |
% Productivity i.e. increase in production/Norma! production | 25.9% |
Advice: Rowan plan fulfils the company’s assurance of 20% increase over the present earnings of workers. This would increase productivity by 25.9% only. It will not adjust with the increase in demand by 40%.
Question 27.
In a factory, the basic wages rate is ₹ 100 per hour and overtime rates are as follows:
Before and after normal working hours | 175% of basic wage rate |
Sundays and holidays | 225% of basic w age rate |
During the previous year, the following hours were worked | |
Normal lime | 1,00.000 hours |
Overtime before and after working hours | 20,000 hours |
Overtime on Sundays and holidays | 5,000 hours |
Total | 1,25,000 hours |
The following hours have been worked on job ‘Z
Normal | 1000 hours |
Overtime before and alter working hrs. | 100 hours |
Sundays and holidays | 25 hours |
Total | 1,125 hours |
You are required to CALCULATE the labour cost chargeable to job ‘Z’ and overhead in each of the following instances:
(a) Where overtime is worked regularly throughout the year as a policy due to the workers’ shortage.
(b) Where overtime is worked irregularly to meet the requirements of production.
(c) Where overtime is worked at the request of the customer to expedite the job. [lCAI Module]
Answer:
Computation of effective average wage rate (including overtime premium):
₹ | |
Normal wages (1,00,000 hrs. × ₹ 100) | 1,00,00,000 |
Wages for overtime before and after working hours (20,000 hrs. × ₹ 100 × 175%) |
35,00,000 |
Wages for overline on Sundays and holidays (5,000 hrs. × ₹ 100 × 225%) |
11,25,000 |
Total Wages for 1,25,000 hrs. | 1,46,25,000 |
Effective average wage rate = (₹1,46,25,0001,25,000 hours ) = ₹ 117
(a) Where overtime is worked regularly as a policy due to workers’ shortage:
The overtime premium is treated as a part of employee cost and job is charged at an effective average wage rate.
Employee cost chargeable to Job Z = 1,125 hrs. × ₹ 117 = ₹ 1,31,625
(b) Where overtime is worked irregularly to meet the requirements of production:
Basic wages will be charged to the job and overtime premium will be charged to factory overheads.
Employee cost chargeable to Job Z = 1,125 hours × ₹ 100 = ₹ 1,12,500
Factory overhead:
= [100 hrs. × (₹ 175 – ₹ 100)] + [25 hrs. × (₹ 225 – ₹ 100)]
= ₹ 7,500 + ₹ 3,125 = ₹ 10,625
(c) Where overtime is worked at the request of the customer, to expedite the job:
Overtime premium will also be charged to Job Z.
Employee cost of Job Z:
Normal wages (1,125 hrs. × ₹ 100) = ₹ 1,12,500
Overtime premium .
[(100 hrs. × ₹ 75) + (25 hrs. × ₹ 125)] = ₹ 10.625
Total ₹ 1,23,125
Question 28.
It is seen from the job card for repair of the customer’s equipment that a total of 154 labour hours have beep put in as detailed below:
In terms of an award in employee conciliation, the workers are to be paid dearness allowance on the basis of cost of living index figures relating to each month which works out @ ₹ 968 for the relevant month. The dearness allowance is payable to all workers irrespective of wages rate if they are present or are on leave with wages on all working days.
Sunday is a weekly holiday and each worker has to work for 8 hours on all week days and 4 hours on Saturdays; the workers are however paid full wages for Saturday (8 hours for 4 hours worked).
Overtime is paid twice of ordinary wage rate if a worker works for more than nine hours in a day or forty-eight hours in a week. Excluding holidays, the total number of hours works out to 176 in the relevant month. The company’s contribution to Provident Fund and Employees State Insurance Premium are absorbed into overheads.
Calculate the wages payable to each worker. [ICAI Module]
Answer:
Calculation of equivalent hours to be paid to the workers
Employee Cost and Direct Expenses – CA Inter Costing Question Bank
Question 1.
Distinguish between “Direct and Indirect labour costs”. (Nov 2001, 2 marks)
Answer:
Direct and Indirect Labour cost:
Direct Labour Cost is the labour cost that is specifically incurred for or can be readily charged to a person identified with a specific job, contract, work order or any other unit of cost.
Indirect Labour Cost is the labour cost which cannot be readily identified with products or services but is generally incurred in carrying out production activity.
The importance of the distinction lies in the fact that whereas direct labour cost can be identified with and charged to the job, indirect labours costs cannot be so charged and is therefore, to be treated as part of the factory O/H and it is to be included in the cost of production.
Question 2.
What do you mean by time and motion study? Why is it so important to management? (May 1999, 6 marks)
Answer:
Time Study: Under this study, a standard time is assigned for the performance of a given job on the basis of the measurement of work required under a prescribed method. In this study proper allowance is provided for fatigue natural needs (for naturebs call) and unavoidable delay.
The main object of this study is to establish a standard time for a specific job, through a specific method under a normal working condition by the average workers. The main object of this study means to eliminate the wastage and minimise the labour cost.
Advantages:
- It is helpful for the fixation of an incentive plan.
- It is helpful for the calculation of production cost.
- It is helpful for establishing the process of production, budgeting, scheduling, etc.
- It is helpful for establishing standard cost under the standard costing system.
Motion Study: Every operation requires certain body of motion and every motion has it’s own time and own fatigue. So, by improving the operation we can eliminate unnecessary motion and as a result of which productivity will increase by which cost per unit will decrease.
Advantages:
- Faster and better working
- Planning of operation
- Better distribution of work.
- Better working condition
So, the ultimate result is high productivity at low cost.
Question 3.
Answer the following:
Enumerate the various methods of Time booking. (May 2007, 2 marks)
Answer:
The various methods of Time Booking are:
- Piece work card
- Daily time sheet
- Weekly time sheet
- Clock card
- Time ticket
- Job ticket
- Combined Time and Job ticket.
Question 4.
Discuss accounting treatment of idle capacity costs in cost accounting. (May 2009, 3 marks)
Answer:
Idle Capacity: It represents the difference between practical capacity and the capacity based on long term sales expectancy.
lithe actual capacity is different from the capacity based on sales expectancy, then the idie capacity is the difference between the practical capacity and the actual capacity.
∴ Idle capacity represents a part of practical capacity which has not been utilized due to regular interruptions and which may not be avoided. Idle capacity cost can be determined as
Idle Capacity Cost = Total OH related to plant Normal capacity × Idle capacity
It may be normal or abnormal.
The treatment can be done In the following ways:
Question 5.
Discuss any four objectives of ‘Time keeping’ in relation to attendance and payroll procedures. (Nov 2020, 4 marks)
Question 6.
What is idle time? Explain the causes leading to idle time and its treatment in cost accounts. (May 2000, 3 marks)
Answer:
idle time represents a loss of time for which the enterprise pays wages to the employees but secures no benefit or work from such employees. It increases the labour cost without any increase in the output.
Idle time may arise due to some normal reasons which cannot be avoided or abnormal reasons which can be avoided if proper precautions are taken at proper time.
Treatment in cost accounts :
If idle time arises due to normal causes:
The labour cost of the normal idle time is to be borne by the cost of production. It can be further segregated in 2 parts: .
- If it is paid to direct labour :
Treated as part of direct labour cost by inflating the hourly rate. - If it is paid to indirect workers :
Becomes a part of production overhead expense.
If idle time arises due to abnormal causes :
It cannot be recovered from the cost of product. So such loss can be transferred to costing Profit & Loss A/c.
Another approach can be used under which entire labour cost of normal idle time can be charged to production OH. In such circumstances, it can be absorbed by the output or production. Therefore, proper control is required in order to minimise the idle time.
Question 6.
Discuss the accounting treatment of the following in cost-accounts: Idle time and Over-time wages (May 2003, 3 marks)
OR
Discuss the treatment of Idle time and Overtime premium in Cost Accounting. (May 2006, 4 marks)
Answer:
Over time:
Accounting treatment of overtime premium depends upon the circumstances of the work:
Case 1: If the overtime is worked on customer’s instruction In order to complete the work at the earliest-then it should be directly charged to the job as a part of direct wages.
Case 2 : If the overtime is worked due to shortage of the labour or any other reason – then it is treated as a part of the labour cost and such overtime premium is appointed on the basis of total hours work on different jobs.
Case 3 : If the overtime is worked to make-up the lost time due to unavoidable reason it means it is a cost incurred for normal time and it should be treated as part of the production OH and it can be recovered from the job completed during the accounting period.
Case 4 : If the overtime is worked to make-up the time lost due to avoidable reasons i.e. abnormal idle time – then it is charged to costing
Profit/Loss A/c.
Case 5 : If overtime is worked due to its management fault then it should be charged to that particular department.
Question 7.
Following data have been extracted from the books of M/s. ABC Private Limited:
(i) Salary (each employee, per month) – ₹ 30,000
(ii) Bonus – 25% of salary
(iii) Employer’s contribution to PF, ESI etc. – 15% of salary
(iv) Total cost at employees’ welfare activities – ₹ 6,61,500 per annum
(v) Total leave permitted during the year – 30 days
(vi) No. of employees – 175
(vii) Normal idle time – 70 hours per annum
(viii) Abnormal idle time (due to failure of power supply) – 50 hours
(ix) Working days per annum – 310 days of 8 hours
You are required to calculate:
(i) Annual cost of each employee
(ii) Employee cost per hour
(iii) Cost of abnormal idle time, per employee (Nov 2018, 5 marks)
Answer:
(i) Statement showing Annual Cost of each employee
Net Selling Price Per Unit = ₹ 2,000 – 15% discount on ₹ 2,000
= ₹ 1,700
(ii) Employee cost per hour:
(iii) Cost of abnormal Idle time, per employee = 50 hours × ₹ 234 = ₹ 11,700
Question 8.
Discuss the effect of overtime payment on productivity. (Nov 2001, 3 marks)
Answer:
Effect of overtime payment on productivity : Overtime work should be resorted to, only when it is extremely essential because It Involves extra cost.
The overtime payment increases the costal production In the following ways:
- The overtime premium paid is an extra payment in addition to the normal rate.
- The efficiency of operators during overtime work may fall and thus output may be less than normal output.
- In order to earn more, workers may not concentrate on work during normal idle time and thus the output during normal hours may also fall.
- Reduced output and increased premium of overtime will bring about an increase in costs of production.
- Gives rise to associated costs like lighting etc.
- Adversely affects the health of workers in long run.
- Increases the wear and tear of machinery.
- Promotes dissatisfaction among the workers who do not get the opportunity of overtime.
- Create difficulty in discontinuance of the practice of overtime work if it is once allowed.
- Promotes a tendency among the workers to keep the work pending so that overtime work is necessitated.
Question 9.
Discuss the treatment of overtime premium in Cost Accounting. (Nov 2004, May 2008, 3, 2 marks)
Answer:
Over time:
Accounting treatment of overtime premium depends upon the circumstances of the work :
Case 1: If the overtime is worked on customer’s instruction in order to complete the work at the earliest- then it should be directly charged to the job as a part of direct wages.
Case 2: If the overtime is worked due to shortage of the labour or any other reason-then it is treated as a part of the labour cost and such overtime premium is appointed on the basis of total hours work on different jobs.
Case 3: If the overtime is worked to make-up the lost time due to unavoidable reason it means it is a cost incurred for normal time and it should be treated as part of the production OH and it can be recovered from the job completed during the accounting period.
Case 4: If the overtime is worked to make-up the time lost due to avoidable reasons i.e. abnormal idle time -then it is charged to costing Profit/Loss A/c.
Case 5: If overtime is worked due to its management fault then it should be charged to that particular department.
Question 10.
Following are the particulars of two workers ‘R’ and ‘S’ for a month :
The normal working hours for the month are 200 hrs. Overtime is paid at double the total of normal wages and dearness allowance. Employer’s contribution to State Insurance and Provident Fund are at equal rates with employees’ contributions.
Both workers were employed on jobs A, B and C in the following proportions:
Jobs | A | B | C |
R | 75% | 10% | 15% |
S | 40% | 20% | 40% |
Overtime was done on job ‘A’.
You are required to:
(i) Calculate ordinary wage rate per hour of ‘R’ and ‘S’.
(ii) Allocate the worker’s cost to each job ‘A’, ‘B’ and ‘C’. (Nov 2020, 6 marks)
Question 11.
State the circumstances in which time rate system of wage payment can be preferred in a factory. (Nov 2001, 3 marks)
Answer:
Circumstances in which time rate system of wage payment can be preferred is as follows:
- Persons whose services cannot be directly or tangibly measured. e.g. general helpers, supervisory and clerical staff etc.
- Workers engaged on highly skilled jobs on sending skilled services, e.g. tool making, inspection and testing.
- Where the pace of output is independent of the operation e.g., automatic chemical plants.
Question 12.
Describe briefly, how wages may be calculated under the following systems:
(i) Rowan system
(ii) Halsey system. (Nov 2008, 9 marks)
Answer:
(i) Rowan System :
In it essence, the plan is similar to the Halsey Plan wages at the ordinary rate for actual time put in by a worker are guaranteed and a bonus given, if the worker saves time out of the standard time, set for him. According to this plan, the bonus is that proportion of wages of actual time taken which time saved bears to the standard time.
Formula for calculating wages under Rowan system:
Time saved Time allowed × time taken × Rate per hour
(ii) Halsey System :
Under this method, standard time for doing a job is determined and workers are encouraged to do the job in less than the standard time. A standard is fixed for each job or process. If there is no saving on this standard time allowance, the worker is paid only his day rate.
He gets his time rate even if he exceeds the standard time limit, since his day rate is guaranteed. If, however, he does the job in less than the standard time, he gets a bonus equal to 50 percent of wages of time saved; the employer benefits by the other 50 percent. The scheme also is sometimes referred to as the Halsey fifty percent plan.
Formula for calculating wages under Halsey system :
= Time taken × Time Rate + 50% of time saved × Time Rate
The Halsey-Weir system is the same as the Halsey system except that the bonus paid to workers is 30% of time saved. This system is useful for capital intensive industry.
Question 13.
Answer the following:
Which is better plan out of Halsey 50 percent bonus scheme and Rowan bonus scheme for an efficient worker? In which situation the worker get same bonus in both schemes? (May 2010, 3 marks)
Answer:
- Rowan Bonus Scheme pays more bonus if the time saved is below the 50 percent of time allowed and if the time saved is more than 50 percent of time allowed then Halsey bonus scheme pays more bonus.
- Normally, time saved by a worker is not more than 50 percent of time allowed.
- Therefore, the Rowan bonus scheme is better for an efficient worker. When the time saved is equal to 50 percent of time allowed then both plans pay same bonus to a worker.
Bonus under Halsey Plan
= Standard wage rate × 50/100 × Time saved ……………… (i)
Bonus under Rowan Plan
= Standard wage rate × Time taken Time allowed × TimeSaved ……………….. (ii)
Bonus under Halsey Plan will be equal to the
Bonus under Rowan Plan when the following condition holds good
= Standard wage rate × 50/100 × Time saved
= Standard wage rate × Time taken Time allowed × Time saved
or 12 = Time taken Time allowed
or Time taken = 12 of time allowed.
Hence, when the time taken is 50% of the time allowed, the bonus under Halsey and Rowan Plans is equal.
Question 14.
The finishing shop of a company employs 60 direct workers. Each worker is paid ₹ 400 as wages per week of 40 hours. When necessary, overtime is worked upto a maximum of 15 hours per week per worker at time rate plus one-halt as premium. The current output on an average is 6 units per man hour which may be regarded as standard output. If bonus scheme is introduced, it is expected that the output will increase to 8 units per man hour. The workers will, if necessary, continue to work Overtir9e upto the specified limit although no premium on incentives will be paid.
The company is considering introduction of either Halsey Scheme or Rowan Scheme of Wage Incentive system. The budgeted weekly output is 19,200 units. T selling price is ₹ 11 per unit and the direct Material Cost is ₹ 8 per unit. The variable overheads amount to ₹ 0.50 per direct labour hour and the fixed overhead is ₹ 9,000 per week.
Prepare a Statement to show the effect on the Company’s weekly Profit of the proposal to introduce (a) Halsey Scheme, and (b) Rowan Scheme. (May 2002, 8 marks)
Answer:
Calculation of total wages under the present scheme
Wage rate per hour per workers = ₹40040hrs = ₹ 10/hours..
∴ Overtime Rate hrs/workers = Normal rate/hr + 50%
= ₹ 10 + 50%
= ₹ 15/per hour
Average current output/hour = 6 units
∴ Hours to be worked for budgeted weekly output of 19,200 units
= 19,200 units 6 units = 3 200 hours per man hour 6 units
Total normal hours available in a week
= No. of workers × Hours per week
= 60 workers × 40 hours
= 2,400 hours
Overtime hour required to be worked:
= Total hours to be worked – Total normal hrs. available •
= 3,200 hrs. – 2,400 hrs. = 800 hrs.
Total wages under the proposed scheme:
Time allowed : For 6 units = 1 hours
∴ For 19,200 units = 19,2006 Units = 3,200 hrs.
6 Units
Time taken : 8 units need 1 hour
∴ 19,200 units need = 19,2008 = 2 400 hours
∴ Time saved = Time allowed – Time taken
= 3,200 – 2,400
= 800 hrs.
Under Halsey Normal wages + Bonus:
Total wages = (Time taken × Time rate ) + (50% × time saved × Time Rate)
= (2,400 × 10) + (50% × 800 × 10)
= 24,000 + 4,000 = ₹ 28,000/-
Under Rowan: ‘
Total wages = Normal wages + Bonus
= (Time taken × Time Rate) + (Time Saved × Time taken Time allowed × Time rate)
= (2,400 × 10) + (800 × 2,4003,200 × 1o)
= 24,000 + 6,000 = ₹ 30,000
Statement of Profit
Working Notes : .
1. Overtime Premium rate = Overtime rate – Normal rate
= ₹ 15 – ₹ 10
= ₹ 5/-
2. Variable overheads are given as absorption rates which are absorbed on the basis of Direct Labours Hours worked.
Hence, Under Present Scheme – Direct Labour Hours worked were 3,200 Hrs. (including overtime)
∴ Overheads = 3,200 hours × 0.5 = ₹ 1,600/-
Under Halsey & Rowan Scheme – Direct Labour hours worked were 2,400 hrs. (& rest 800 hrs. were saved & not worked). So for 2,400 hrs’worked = 2,400 × 0.5 = ₹ 1,200.
Question 15.
A Company is undecided as to what kind of wage scheme should be introduced. The following particulars have been compiled in respect of three systems, which are under consideration of the management:
For the purpose of piece rate, each minute is valued at ₹ 0.10.
You are required to calculate the wages of each worker under:
(i) Guaranteed hourly rates basis
(ii) Piece work earnings basis, but guaranteed at 75% of basic pay (guaranteed hourly rate) if his earnings are less than 50% of basic pay.
(iii) Premium bonus basis where the worker receives bonus based on Rowan scheme. (Nov 2002, 9 marks)
Answer:
(i) Computation of wages under Guaranteed Hourly Rate basis
(ii) Computation of wages of each worker under piece work earnings basis:
Since, each workers has been guaranteed at 75% at basic pay, if his earnings are less than 50% of basic pay, therefore, workers A & C will be paid the wages as computed viz. ₹ 228 & 315 respectively. The computed wages of worker B is ₹ 75 which is less than 50% of his basic pay viz ₹ 100, therefore he would be paid 75% × 200 = ₹ 150/-
Working Notes :
1. Piece rate per unit:
2. Time allowed to each worker:
Worker A = 21 units × 12 min. + 36 units × 18 min. + 46 units × 30 min.
= 2,280 min. = 38 hrs
Worker B = 25 units × 30 min.
= 750 min. = 12.5 hrs
Worker C = 60 units × 12 min. + 135 units × 18 min.
= 720 min. + 2430 min.
= 31,50 min. = 52.50 hrs.
(iii) Computation of wages of each worker under Premium Bonus basis (where each workers receives bonus based on Rowan Plan)
Question 16.
ZED Limited is working by employing 50 skilled workers. It is considered the introduction of incentive scheme-either Halsey scheme (with 50% bonus) or Rowan scheme of wage payment for increasing the labour productivity to cope up the increasing demand for the product by 40%. It is believed that proposed incentive scheme could bring about an average 20% increase over the present earnings of the workers; if could act as sufficient incentive for them to produce more.
Because of assurance, the increase in productivity has been observed as revealed by the figures for the month of April, 2004.
Hourly rate of wages (guaranteed) – ₹ 30
Average time for producing one unit by one worker at the previous performance (This maV be taken as time allowed) – 1.975 hours
Number of working days in the month – 24
Number of working hours per day of each worker – 8
Actual production during the month – 6,120 units
Required:
(i) Calculate the effective rate of earnings under the Halsey scheme and the Rowan scheme.
(ii) Calculate the savings to the ZED Limited in terms of direct labour cost per piece.
(iii) Advise ZED Limited about the selection of the scheme to fulfil his assurance. (May 2004, 4 + 2 + 2 = 8 marks)
Answer:
Working Notes :
1. Computation of time saved (in hours) per month:
= Standard production time of 6,120 units – actual time taken by the workers
= (6,120 units × 1.975 hrs. – 24 days × 8 hrs./day × 50 skilled workers)
= 12,087 hrs. – 9,600 hrs.
= 2,487 hours
2. Computation of bonus for time saved (in hours ) under Halsey & Rowan Plan:
Time saved hours = 2487 hrs
(Refer W.N.-1) .
Wage rate per hour = ₹ 30
Bonus under Halsey Scheme = 1/2 × 2,487 hrs × ₹ 30/-
= ₹ 37,305/-
Bonus under Rowan scheme = Time Saved × ×Rateperhour=[latex]2,487hrs.12,087hrs × 9,600 hrs × ₹ 30
= ₹ 59,258.38
(i) Computation of effective rate of earning under the Halsey & Rowan scheme
Total parning (under Halsey) = Time wages + Bonus
(W.N.-2) = 24 days × 8 hrs × 50 skilled worker × ₹ 30+ 37,305
= ₹ 2,88,000 + ₹ 37,305
= ₹ 3,25,305.
Total earning (under Rowan scheme) = Time wages + Bonus
(W.N.- 2) = ₹ 2,88,000 + ₹ 59,258.38
= ₹ 3,47,258.38
Effective rate earnings/hour (Under Halsey plan)
(₹ 3,47,258.38/9,600 hrs,) – ₹ 33.89
Effective rate of earning/hour (Under Rowan plan)
(₹ 3,47,258.38/9,600 hrs.) – ₹ 36.17
(ii) Saving to the ZED Ltd. in terms of direct labours cost/unit
(iii) Advised to ZED Ltd:
(Regarding selection of the scheme to fulfill assurance)
Halsey scheme brings more saving to the management of ZED Ltd., Over the present earning of ₹ 2,88,000, but the other scheme i.e. Rowan fulfill the promise of 20% increase over the present earnings of ₹ 2,88,000 by paying 20.58% in the form of Bonus. Hence, Rowan Plan should be adopted.
Question 17.
The existing Incentive system of Alpha Limited is as under:
Normal working week – 5 days of 8 hours each plus 3 late shifts of 3 hours each
Rate of Payment – Day work : ₹ 160 per hour
Late shift: ₹ 225 per hour
Average output per operator for 49-hours week i.e. including 3 late shifts. – 120 articles
In order to Increase output and eliminate Overtime, it was decided to switch on to a system of payment by results. The following Information is obtained:
Time-rate (as usual) : ₹ 160 per hour
Basic time allowed for 15 articles : 5 hours
Piece-work rate : Add 20% to basic piece-rate
Premium Bonus : Add 50% to time
Required:
(i) Prepare a Statement showing hours worked, weekly earnings, number of articles produced and labour cost per article for one operator under the following systems:
(a) Existing time-rate
(b) Straight piece-work
(c) Rowan system
(d) Halsey premium system.
Assume that 135 articles are produced in a 40-hour week under straight piece work, Rowan Premium system, and Halsey premium system above and worker earns half the time saved under Halsey premium system (Nov 2005, 2 × 4 = 8 marks)
Answer:
Statement showing hours worked, weekly earnings, number of articles produced and labour cost per article under various wage systems:
Particular (Scheme) | Hours Worked | Weekly Earning (₹) | No. of Articles Produced | Labour Cost per Article (₹) |
(a) Existing time rate | 49 | 8,425 (W. N. – 1) | 120 | 70.21 |
(b) Straight piece-work | 40 | 8,640 (W. N. – 2) | 135 | 64.00 |
(c) Rowan system | 40 | 9,007.41 (W. N. – 3) | 135 | 66.72 |
(d) Halsey system | 40 | 8,600 (W. N. – 4) | 135 | 63.70 |
Working Notes :
∴ Rate/article = 960 ÷ 15 =64
& Earnings for the week = 135 × 64 = 8,640
Rowan premium system : Basic time = 5 hrs. for 15 articles
Add: 50% to time (i.e.) 2.5 hours for 15 articles
∴ Total time = 7.5 hrs. for 15 articles
or 30 mins / article
∴ Time allowed for 135 articles = 67.5 hrs.
& Actual time taken for 135 articles =40 hrs.
Earnings = (HW × RH) + [TA−HWTA × HW × RH]
= (40 hrs. × ₹ 160) + [67.5–4067.5 × 40 × 160]
= ₹ 9,007.41
Halsey premium system : Earnings
=HW × RH + 50100(TA – HW) × RH
=40 × ₹ 160 + 12 (675 – 40) × ₹ 160
= ₹ 8,600.
Question 18.
Answer the following:
Two workmen. A and B, produce the same product using the same material. A is paid bonus according to Halsey plan, while B is paid bonus according to Rowan plan. The time allowed to manufacture the product is 100 hours. A has taken 60 hours and B has taken 80 hours to complete the product. The normal hourly rate of wages of workman A is ₹ 24 per hour. The total earnings of both the workers are same. Calculate normal hourly rate of wages of workman B. (May 2009, 2 marks)
Answer:
According to the problem,
Total earnings of A = Total earnings of B
1920 = 96 X × (20100)
X = 192096 = ₹ 20
Therefore, hourly rate of wages of the worker is ₹ 20 per hour.
* Bonus = Time Saved × 50% × Wage Rate
** Bonus = Time taken Time Allowed × Time Saved × Wage Rate
Question 19.
Answer the following: .
Standard Time for a job is 90 hours. The hourly rate of Guaranteed wages is ₹ 50. Because of the saving in time a worker A gets an effective hourly rate of wages of ₹ 60 under Rowan premium bonus system. For the same saving in time, calculate the hourly rate of wages a worker B will get under Halsey premium bonus system assuring 40% to worker. (Nov 2009, 3 marks)
Answer:
(i) Increase in Hourly Rate of Wages (Rowan Plan) is (₹ 60 – ₹ 50) = ₹ 10
This is equivalent to
Time Saved Standard Time × Hourly rate
Or 10 = Time Saved Standard Time × 50
Or, Time Saved 90 × 50 = 10
Time Saved = 90050 = 18 Hours
Actual Time Taken = (90 – 18) = 72 Hours
Effective Hourly Rate under Halsey System Time saved = 18 Hours
Bonus @ 40%= 18 × 40 % × 50 = ₹ 360
Total Wages = (50 × 72 + 360) = 3,960
Effective Hourly Rate = 3,960 ÷ 72 Hours = ₹ 55
Question 20.
You are given the following information of a worker:
(i) Name of worker : ‘X’
(ii) Ticket No. : 002
(iii) Work started : 1-4-11 at 8 a.m.
(iv) Work finished : 5-4-11 at 12 noon
(y) Work allotted : Production of 2,160 units
(vi) Work done and approved : 2,000 units
(vii) Time and units allowed : 40 units per hour
(viii) Wage rate : ₹ 25 per hour
(ix) Bonus : 40% oT time saved
(x) Worker X worked : 9 hours a day
You are required to calculate the remuneration of the worker on the following basis:
(i) Halsey plan and
(ii) Rowan plan (May 2011, 5 marks)
Answer:
No. of units produced and approved = 2,000
Standard time = 40 units per hour
Hourly Wage Rate = ₹ 25
Time allowed Rate = 40 units per hour
Time allowed for 2,000 units 2,00040 = 50 hours
(i) Calculation of Remuneration under Halsey Plan :
(ii) Calculation of Remuneration Under Rowan Plan:
Wages for time taken 40 hours @ ₹ 25 = ₹ 1,000
Bonus = Time saved Time allowed × (Time Taken × Hourly Rate)
= 40×10×2550 = ₹ 200
Total = ₹ 1,200
Working Notes :
Question 21.
A skilled worker is paid a guaranteed wage rate of 120 per hour. The standard time allowed for a job is 6 hours. He took 5 hours to complete the job.
He is paid wages under Rowan Incentive Plan.
(i) Calculate his effective hourly rate of earnings under Rowan Incentive Plan.
(ii) If the worker is placed under Halsey Incentive Scheme (50%) and he wants to maintain the same effective hourly rate of earnings, calculate the time in which he should complete the job. (May 2013, 6 marks)
Answer:
(i) Effective hourly rate of earnings under Rowan Incentive Plan:
Earnings under Rowan Incentive plan =
(Actual time taken × wage rate) + Time Saved Time Allowed × Time taken × Wage rate
= (5 hours × 120)+ (1 hour 6 hour × 5 hours × ₹ 120)
= ₹ 600 + ₹ 100 = ₹ 700
Effective hourly rate = ₹ 700/5 hours = ₹ 140/hour
(ii) Effective hourly rate = Earnings under Halsey Rate Time Taken
Let time taken = X
Or, Effective hourly rate under Rowan Incentive plan =
Or, 140X = 120 X+ 360 – 60X
Or 80X = 360
Or,
X = 36080 = 4.5 hours
Therefore, to earn effective hourly rate of ₹ 140 under Halsey Incentive Scheme worker has to complete the work in 4.5 hours.
Question 22.
A skilled worker is paid a guaranteed wage rate of ₹ 150.00 per hour. The standard time allowed for a job is 50 hours. He gets an effective hourly rate of wages of ₹ 180.00 under Rowari Incentive Plan due to saving in time. For the same saving in time, calculate the hourly rate of wages he will get, if he is ptaced under Halsey Premium Scheme (50%). (Nov 2017, 5 marks)
Answer:
Increase in hourly rate of wages under
Rowan Plan is ₹ 30, i.e., (₹ 180 – ₹ 150)
This is equal to Time saved Time allowed × Rate per hour
or Time saved Time allowed × ₹ 150
or Time saved 50 hours × ₹ 150 = ₹ 30
Therefore, Time saved = 10 hours and time taken is 40 hours i.e. (50 hours – 10 hours)
Effective Hourly Rate under Halsey System:
Time saved = 10 hours
Bonus @ 50% = 10 hours × 50% × ₹ 150 = ₹ 750
Total wages = (₹ 150 × 40 hours + ₹ 750) = ₹ 6,750
Effective hourly rate = ₹ 6,750 ÷ 40 hours
= ₹ 168.75
Working Note:
Effective Hourly Rate =
Question 23.
Answer the following:
A worker takes 15 hours to complete a piece of work for which time allowed is 20 hours. His wage rate is 5 per hour. Following additional information are also available:
Material cost of work – ₹ 50
Factory overheads – 100% of wages
Calculate the factory cost of work under the following methods of wage an payments:
(i) Rowan Plan
(ii) Halsey Plan (May 2018, 5 marks)
Answer:
Calculation of Factory Cost of Work:
Halsey Plan = Time Taken × Time Rate + 50% of Time Saved × Time Rate
= 15 hours × ₹ 5 + (50% of 5 hours) × ₹ 5
= ₹ 87.50
Question 24.
Zico Ltd. has its factory at two locations viz Nasik and Satara. Rowan plan is used at Nasik factory and Halsey plan at Satara factory. Standard time and basic rate of wages are same for a job which is similar and is carried out on similar machinery. Normal working houis is 8 hours per day in a 5 day week.
Job in Nasik factory is completed in 32 hours while at Satara factory it has taken 30 hours. Conversion costs at Nasik and Satara are ₹ 5408 and ₹ 4950 Overheads account for ₹ 25 per hour.
Required:
(i) To find out the normal wage: and
(ii) To compare the respective conversion costs. (Nov 2019, 10 marks)
Answer:
Step 1: Let X be the cost of material and Y be the normal rate of wages per hour.
Step 2 : Factory Cost of Nasik Factory:
X + 32Y + 6.4Y + ₹ 800 = ₹ 5,408
X + 38.4Y = ₹ 4,608 ………………………. Equation (i)
Step 3: Factory Cost of Satara Factory:
X + 30Y + 5Y + ₹ 750 = ₹ 4,950
X + 35Y = ₹ 4,200 …………………………. Equation (ii)
Step 4 : Subtract equatFon (i) from equation (ii)
Y = ₹ 120
New, X + 38.4Y =₹ 4,608
X + 38.4(120) = ₹ 4,608
X = 0
Normal Wage: Nasik factory = (₹ 120 × 32) = ₹ 3,840
Satara factory = (₹ 120 × 30) = ₹ 3,600
(ii) Comparative Statement of respective conversion costs
Question 25.
Z Ltd. Is working by employing 50 skilled workers. It is considering the introduction of an incentive scheme – either Halsey Scheme (with 50% Bonus) or Rowan Scheme – of wage payment for increasing the labour productivity to adjust with the increasing demand for its products by 40%. The company feels that if the proposed incentive scheme could bring about an average 20% increase over the present earnings of the workers, it could act as sufficient incentive for them to produce more and the company has accordingly given assurance to the workers.
Because of this assurance, an increase in productivity has been observed as revealed by the figures for the month of April, 2020:
Required :
(i) Calculate the effective increase in earnings of workers in percentage terms under Halsey and Rowan scheme.
(ii) Calculate the savings to Z Ltd. in terms of direct labour cost per unit under both the schemes.
(iii) Advise Z Ltd. about the selection of the scheme that would fulfil its assurance of incentivising workers and also to adjust with the increase in demand. (Jan 2021, 10 marks)
Question 26.
A job can be executed either through workman A or B. A takes 32 hours to complete the job while B finishes it in 30 hours. The standard time to finish the job is 40 hours.
The hourly wage rate s same for both the workers. In addition workman A is entitled to receive bonus according to Halsey plan (50%) sharing while B is paid bonus as per Rowan plan. The works overheads are absorbed on the job at ₹ 7.50 per labour hour worked. The factory cost of the job comes to ₹ 2.600 irrespective of the workman engaged.
INTERPRET the hourly wage rate and cost of raw materials input. Also show cost against each element of c included in factory cost.
Answer:
Calculation of:
1. Time saved and wages:
2. Bonus Plan:
Halsey | Rowan | |
Time saved (hrs.) | 8 | 10 |
Time saved (hrs.) | 4x ⌊8hrs×₹x2⌋ |
7.5x ∣∣10hrs40hrs×30hrs×₹×∣∣ |
3. Total wages :
Workman A: = 32x + 4x = ₹ 36x
Workmna B: = 30x + 7.5x = ₹ 37.5 x
Statement of factory cost of the job
Workmen | A (₹) | B (₹) |
Material cost (assumed) | y | y |
Wages (shown above) | 36x | 37.5X |
Works overhead | 240 | 225 |
Factory cost (given) | 2,600 | 2600 |
The above relations can be written as follows:
36x + y + 240 = 2,600 ……….. (i)
37.5x + y + 225 = 2,600 ………….. (ii)
Subtracting (i) from (ii) we get .
1.5x – 15 = 0
Or, 1.5x = 15
Or, x = ₹ 10 per hour
On substituting the value of x in (i) we get y = ₹ 2,000
Hence the wage rate per hour is ₹ 10 and the cost of raw material is ₹ 2,000 on the job.
Question 27.
A Company is undecided as to what kind of wage scheme should be introduced. The following particulars have been compiled in respect of three workers. Which are under consideration of the management.
For the purpose of .piece rate, each minute is valued at ₹ 1/-
You are required to CALCULATE the wages of each worker under:
(i) Guaranteed hourly rate basis
(ii) Piece work earning basis, but guaranteed at 75% of basic pay (Guaranteed hourly rate if his earnings are less than 50% of basic pay.)
(iii) Premium bonus basis where the worker received bonus based on Rowan scheme.
Answer:
(i) Computation of wages of each worker under guaranteed hourly rate basis
Worker | Actual hours worked (Hours) | Hourly wage rate (₹) | Wages (₹) |
I | 380 | 40 | 15,200 |
II | 100 | 50 | 5,000 |
III | 540 | 60 | 32,400 |
(ii) Computation of Wages of each worker under piece work earning basis
Since -each worker’s earnings are more than 50% of basic pay.
Therefore, worker-I, II and III will be paid the wages as computed i.e. ₹ 24,150, ₹ 7,500 and ₹ 36,000 respectively.
Working Notes:
1. Piece rate per unit
Product | Standard time per unit in minute | Piece rate each minute (₹) | Piece rate per unit (₹) |
A | 15 | 1 | 15 |
B | 20 | 1 | 20 |
C | 30 | 1 | 30 |
2. Time allowed to each worker
Worker – I = 380402.5 × 22.5 × 40 = 850
Worker – II = 100125 × 25 × 50 = 1,000
Worker – III = 540600 × 60 × 60 = 3,240
Question 28.
Answer the following:
X executes a piece of work in 120 hours as against 150 hours allowed to him. His hourly rate is ₹ 10 and he gets a dearness allowance @ ₹ 30 per day of 8 hours worked in addition to his wages. You are required to calculate total wages received by X under the following incentive scheme: Rowan Premium Plan , [Modified] (Nov 2011, 5 marks)
Answer:
Standard Time = 150 hours
Actual Time = 120 hours i.e. 15 days
Time Saved = 30 hours
Hourly Wage Rate = ₹ 10
DA = ₹ 30/day
= 30 × 15 = 450
Rowan Premium Plan
(Actual Time × Time Rate) + (Time Saved × Time Taken Time Allowed × Time Rate)
= (120 × 10 + DA) + (30 × 120150 × 10)
= (120 × 10 + 450) + (240)
= 1,200 + 450 + 240
= ₹ 1,890
Question 29.
The management of a company wants to formulate an incentive plan for the workers with a view to increase productivity. The following particulars have been extracted from the books of company.
Piece Wage rate – ₹ 10
Weekly working hours – ₹ 40
Hourly wages rate – ₹ 40 (guaranteed)
Standard/normal time taken per unit 15 minutes.
Actual output for a week:
Worker A – 176 pieces
Worker B – 140 pieces
Differential piece rate: 80% of piece rate when output below normal and 120% of piece rate when output above normal.
Under Halsey scheme, worker gets a bonus equal to 50% of Wages of time saved.
Calculate:
Earning of workers under Halseys and Rowans premium scheme. [Modified] (May 2012, 8 marks)
Answer:
Calculation of earnings for workers under different incentive plans:
Halsey’s Premium Plan:
Question 30.
M/s. Zeba Private Limited allotted a standard time of 40 hours for a job and the rate por hour is ₹ 75. The actual time taken.by a worker is 30 hours.
You are required to calculate the total earnings under the following plans:
(i) Halsey Premium Plan (Rate 50%) .
(ii) Rowan Plan
(iii) Time Wage System
(iv) Piece Rate System [Modified] (May 2019, 5 marks)
Answer:
(i) Halsey Premium Plan:
Halsey Premium Plan (Wages)
= (Time taken × Time Rate) + (50% of time saved × time rate)
= (30 hours × ₹ 75) + (40 hours – 30 hrs) × 50% × ₹ 75
= ₹ 2,625
(ii) Rowan Plan
Rowan Plan (Earnings) = (Time Taken × Rate Per hour) + Time Saved Time Allowed × Time Taken × Rate per hour
= (30 hours × ₹ 75) + [10hrs40hrs × 30hrs × ₹ 75)
= ₹ 2,250 + 562.50 .
= ₹ 2,812.50
(iii) Time Wage System:
Time Wage System (Earnings) = Hours Works × Rate Per hour
= 30 hours × ₹ 75
= ₹ 2,250
(iv) Piece Rate System:
Std. Time × Rate per hour
= 40 × ₹ 75
= ₹ 3,000.
Question 31.
Calculate the Employee hour rate of a worker A from the following data:
Basic pay – 10,000 pm
D.A. – 36,000
Fringe benefits – 12,000
Number of working days in a year 320.20 days are availed off as holidays on full pay in a year. Assume a day of 8 hours.
Answer:
(i) Effective working days in a year – 320
Less: Leave days on full pay – 20
Effective working days – 300 days
Total effective working hours (300 days × 8 hours) = 2400
(ii)
(iii) Hourly rate : ₹ 1,68,000/2400 hours = ₹ 70.00
Question 32.
A worker is paid 10,000 per month and a dearness allowance of ₹ 2,000 p.m. Worker contribution to provident fund is @ 10% and employer also contributes the same amount as the employee. The Employees State Insurance Corporation premium is 6.5% of wages of which 1.75% is paid by the employees. It is the firm’s practice to pay 2 months’ wages as bonus each year.
The number of working days in a year are 300 of 8 hours each. Out of these the worker is entitled to 15 days leave on full pay. Calculate the wage rate per hour for costing purposes.
Answer:
Effective hours per year: 285 days × 8 hours = 2,280 hours
Wages rate per hour (for costing purpose): ₹ 1,89,240/ 2,280 hours = ₹ 83
Question 33.
What do you understand by labour turnover? How is it measured? (May 2003, 1 + 4 = 5 marks)
OR
Define Labour Turnover’. How is it measured? Explain. (Nov 2014, 4 marks)
Answer:
Meaning :
Labour turnover refers to “the rate of change in the composition of labour force during a particular period measured against suitable index “. It arises because an organisation is a dynamic entity and not a static one. Definition : Prof. B Banerjee has therefore defined labour turnover as “The rate of change in the labour force of an organisation during a specified period.”
Measurement of Labour Turnover:
Three important methods are available to measure labour turnover. The company may use any one of these methods for the purpose of measuring the rate of labour turnover. But for the purposes of facilitating both the trend analysis (e.g. company’s labour turnover rate during the year just ended with the preceeding years) and the inter firm comparison (e.g. comparing the rate of labour turnover of a company with that of others), it is necessary to use the method selected consistently year after year.
Since, each method lays emphasis on a particular aspect and therefore, no useful and meaningful comparison can be made if there is a change or difference in the method of measuring labour turnover. The three methods are :
- Separation method
- Replacement method
- Flux method
1. Separation Method; Underthis method, labourturnover is measured by dividing the total number of separations during a period by the average no. of employees on the pay roll. The result is to be multiplied by 100 to express it in the form of percentage.
Therefore,
LTO = No. of separations during a period Avg. no. of employees during the period × 100
Where,
Avg. no. of employees = [ No. of employees at the beginning of the period ]+[ No. of employees at the end of the period ]2
2. Replacement Method: Under this method labour turnover is measured by dividing the number of replacements made, irrespective of number of separations, during a period by the average number of employees on the payroll. The important point to be noted is that only the replacements made to fill the vacancies caused by the separations are to be considered for measuring labour turnover under this method. Therefore,
LTO = No. of separations made during a period Avg. no. of employees during the period × 100
3. Flux Method: Under this method, both the number of separations and replacements are considered. Hence, labour turnover is computed by dividing the aggregate of no. of separations & replacements during a period by the average number of employeeS. Therefore,
[No. of separations during a period]+(No. of replacements during a period]
LTO = [ No. of separations during a period ]+[ No. of replacements during a period ] Average no. of employees during the period
Question 34.
Discuss the two types of cost associated with labour turnover. (Nov 2003, 3 marks)
Answer:
The two types of costs associated with labour turnover are:
1. Preventive costs: These are costs incurred to keep the labour turnover at a low level, e. g. cost of medical services, welfare schemes and pension schemes. If the firm incurs high preventive costs, its rate of labour turnover is usually low.
2. Replacement costs: These are costs arising due to high labour turnover and represents the amount spent on new workers. Some examples are cost of employment, training and induction, abnormal breakage and scrap, extra wages and overheads due to inefficiency of new workers. The company will incurs high replacement costs if its rate of labour turnover is high.
Hence every company must work out an optimum level of labour turnover keeping in view its personnel policies and behaviour of replacement and preventive costs at various levels of labour turnover rates.
Question 35.
Discuss the three methods of Calculating labour turnover. (Nov 2004, Nov 2010, 3, 4 marks)
Answer:
Meaning :
Labour turnover refers to “the rate of change in the composition of labour force during a particular period measured against suitable index”. It arises because an organisation is a dynamic entity and not a static one.
Definition :
Prof. B Banerjee has therefore defined labour turnover as wThe rate of change in the labour force of an organization during a specified period.”
Measurement of Labour Turnover :
Three important methods are available to measure labour turnover. The company may use any one of these methods for the purpose of measunrig the rate of labour turnover. But for the purposes of facilitating both the trend analysis (e.g. company’s labour turnover rate during the year just ended with the preceding years) and the inter firm comparison (e.g. comparing the rte of labour turnover of a company with that of others), it is necessary to use the method selected consistently year after year.
Since each method lays emphasis on a particular aspect and therefore, no useful and meaningful comparison can be made if there is a change or difference in the method of measuring labour turnover. The three methods are:
- Separation method
- Replacement method
- Flux method
1. Separation Method: Under, this method, labour turnover is measured by dividing the total number of separations during a period by the average no. of employees on the pay roll. The result is to be multiplied by 100 to express it in the form of percentage. Therefore,
LTO = No. of separations during a period Avg. no. of employees during the period × 100
Where,
Avg. no. of employees = [ No. of employees at the beginning of the period ]+[ No. of employees at the end of the period ]2
2. Replacement Method: Under this method labour turnover is measured by dividing the number of replacements made, irrespective of number of separations, during a period by the average number of employees on the payroll. The important point to be noted s that only the replacements made to fill the vacancies caused by the separations are to be considered for measuring labour turnover under this method. Therefore,
LTO = No. of replacements made during a period Avg no of employees during the period × 100
3. Flux Method: Under this method, both the number of separations & replacements are considered. Hence, labour turnover is computed by dividing the aggregate of no. of separations & replacements during a period by the average number of employees.
Therefore,
LTO = [ No. of separations during a period ]+[ No. of replacements during a period ] Average no. of employees during the period
Question 36.
Enumerate the remedial steps to be taken to minimise the labour turnover. (Nov 2007, 3 marks)
Answer :
The following remedial steps may be adopted to minimise labour turnover:
- Exit interview with each outgoing employee to ascertain the reasons for his leaving the organisation.
- Job analysis and evaluation carried out even before recruitment to ascertain the requirement of each job.
- Scientific system of recruitment, placement and promotion, by fitting the right person in the right job.
- Use of committee, comprising of members from management and workers to handle issue concerning workers grievance, requirements etc.
- Enlightened attitude of management — Mental revolution on the part of management by taking workers into confidence and acting a healthy working atmosphere, with measures such as:
- Training service rules after discussion between management and workers union.
- Provision of facilities for education, training and development of workers.
- Introduction of procedures for settlement of workers grievances.
Question 37.
Enumerate the cause labour turnover. (May 2011, 4 marks)
Answer:
In order to keep the labour turnover rate at the minimum level, it is necessary to understand the various reasons as to why the people leave the organisation. Though it is a very strenuous task to list all the reasons for or causes of LTO, an attempt has been made in the following paragraph to identify some of the important & usual causes which can be classified into two broad categories:
Question 38.
From the following information, calculate Labour turnover rate and Labour flux rate :
No. of workers as on 01.01.2000 = 7,600
No. of workers as on 31 .12.2000 = 8,400
During the year, 80 workers left while 320 workers were discharged. 1,500 workers were recruited during the year of these, 300 workers were recruited because of exits and the rest were recruited in accordance with expansion plans. (May 2001, 4 marks)
Answer:
Question 39.
The management of a company are worried about their increasing labour turnover in the factory and before analysing the causes and taking remedial steps, they want to have an idea of the profit foregone as a result of labour turnover in the last year.
Last year sales amounted to ₹ 83,03,300 and the profit-volume ratio was 20 per cent. The total number of actual hours worked by the Direct Labour Force was 4.45 lakhs. As a result of the delays by the Personnel Department in filling vacancies due to labour turnover, 1 ,00,000 potentially productive hours were lost. The actual direct labour hours included 30,000 hours attributable to training new recruits, out of which half of the hours were unproductive.
The costs incurred consequent on labour turnover revealed on analysis the following:
Assuming that the potential production lost as a consequence of labour turnover could have been sold at prevailing prices, find the profit foregone last year on account of labour turnover. (Nov 2001, 8 marks)
Answer:
Actual Production Hours:
Question 40.
Accountant of your company had computed labour turnover rates for the quarter ended 30th September, 2012 as 14%, 8% and 6% under Flux method, Replacement method and Separation method respectively. If the number of workers replaced during 2 quarter of the financial year 2012-13 is 36, find the following:
(i) The number.of workers recruited and joined; and
(ii) The number of workers left and discharged. (Nov 2012, 5 marks)
Answer:
Labour Turnover Rate (Replacement method)
= No. of workers replaced Average No. of workers
or, 8100 = 36 Average No. of workers
∴ Average No. of workers = 450
Labour Turnover Rate (Separation method) = No. of workers seperated Average No. of workers
or 6100 = No. of workers replaced 450
∴ No. of workers separated = 27
Labour Turnover Rate (Flux Method)
= No. of Separations + No. of accession (Joinings) Average No. of workers
or 14100 = 27+ No. of accession (Joinings) 450
or, 100 (27 + No. of Accessions) = 6,300
∴ No. of Accessions = 36
(i) The No. of workers recruited and Joined = 36
(ii) The No. of workers left and discharged = 27
Question 41.
The rate of change of labour force in a company during the year ending 31st March, 2013 was calculated as 13%, 8% and 5% respectively under ‘Flux Method’, ‘Replacement method’ and ‘Separation method’. The number of workers separated during the year is 40.
You are required to calculate:
(i) Average number of workers on roll.
(ii) Number of workers replaced during the year.
(iii) Number of new accessions i.e. new recruitment.
(iv) Number of workers at the beginning of the year. (Nov 2013, 8 marks)
Answer: .
(i) Labour Turnover Rate (Separation method)
= No. of workers separated Average no. of workers on roll
Or, 5100 = 40 Average no. of workers on roll
Or, Average no. of workers on roll = 800
(ii) Labour Turnover Rate (Replacement method)
= No. of workers replaced Average no. of workers on roll
Or, 8100 = No. of workers replaced 800
Or, No. of workers replaced = 64
(iii) Labour Turnover Rate (Flux Method)
= No. of Separations + No. of accession (new recruitments) Average no. of workers on roll
Or 13100 = 40+ No. of Accessions (New recruitments) 800
Or, 100 (40 + No. of Accessions) = 10,400
Or, No. of new accessions = 64
(iv) No. of workers at the beginning of the year
Let workers at the beginning of the year were ‘X
Average no. of workers on roll
Question 42.
Human Resources Department of A Ltd. computed labour turnover by replacement method at 3% for the quarter ended June 2015. During the quarter, fresh recruitment of 40 workers was made. The number of workers at the beginning and end of the quarter was 990 and 1010 respectively.
You are required to calculate the labour turnover rate by Separation Method and Flux Method. (Nov 2015, 5 marks)
Answer:
Calculation of labour turnover by Separation Method:
Separation Method = No. of workers separated Average no. of Workers × 100
= 501000 × 100
= 5%
Calculation of labour Turnover by Flux Method:
Question 43.
RST Company Ltd. has computed labour turnover rates for the quarter ended 31st March, 2017 as 20%, 10% and 5% under flux method, replacement method and separation method respectively. If the number of workers replaced during that quarter is 50, find out (i) Workers recruited and joined (ii) Workers left and discharged and (iii) Average number of workers on roll. (May 2017, 5 marks)
Answer:
1. Average Number of workers on roll during the year:
Labour turnover rate under Replacement method
= No. of workers replaced Avg. No. of workers on roll × 100
Or 10% = 50 Avg. No. of workers on roll × 100
∴ Average Number of workers on roll = 500
2. Number of workers left and discharged:
Labour turnover rate under Separation method
= No. of Separations Ava No of workers on roll × 100
0r5% = No. of Separations 500 × 100
∴ Number of Separations = 25
3. Number of workers recruited and joined:
Labour turnover rate under Flux Method
= No. of Sep. + Accession Avg. No. of workers on roll × 100
0r 20% = 25+ Accession 500 × 100
∴ Number of the Accession = 75
Question 44.
The information regarding number of employees on roll in a shopping mall [or the month ot December, 2017 are given below:
Number of employees as on 01-12-2017 : 900
Number of empoyees as on 31 -12-2017 : 1100
During December, 2017, 40 employees resigned and 60 employees were discharged. 300 employees were recruited during the month. Out of these 300 employees, 225 employees were recruited for an expansion project of the mall and rest were recruited due to exit of employees.
Assuming 365 days in a year, calculate Employee Turnover Rate and Equivalent Annual Employee Turnover Rate by applying the following:
(i) Replacement Method
(ii) Separation Method
(iii) Flux Method (May 2018, 10 marks)
Answer:
Calculation for Employee Turnover Rate :
(i) Replacement Method: